My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PEZZI
>
7007
>
3500 - Local Oversight Program
>
PR0545654
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:55:18 AM
Creation date
5/7/2020 11:47:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545654
PE
3528
FACILITY_ID
FA0002499
FACILITY_NAME
LINDEN USD-WATERLOO ELEMENTARY
STREET_NUMBER
7007
Direction
N
STREET_NAME
PEZZI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08906065
CURRENT_STATUS
02
SITE_LOCATION
7007 N PEZZI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reconnaissance Groundwater Sampling Procedures <br /> This procedure is used when reconnaissance groundwater sampling without permanent wells is <br /> desired. Either HydroPunchG or temporarily cased open boreholes may be used. <br /> 1 . Reconnaissance groundwater sample, handling, and storage will follow guidance documents of <br /> the Environmental Protection Agency and Regional Water Quality Control Board and local <br /> agency guidelines for the investigation. <br /> 2 . Reconnaissance groundwater samples Nvill be collected in the field in temporarily cased <br /> exploratory boreholes using clean Teflon or disposal bailers. The samples will be collected <br /> from temporarily cased exploratory boreholes. All sample containers will be properly <br /> prepared, sealed, labeled, and identified. Label information will include the date, sampler <br /> name, sampling time, and identification number, and the project name and number. <br /> 3 . The sample will be delivered to a State Certified Laboratory within two days of collection. <br /> Samples will be kept on ice andlor refrigerated continuously for shipment to the Laboratory. <br /> 4 . The sealed sample will only be opened by Laboratory personnel who will perform the chemical <br /> analysis. <br /> 5 . The samples will be analyzed according to the approved EPA Method and storage for the <br /> requested analysis. <br /> 6 . Groundwater sampling will begin 24 hours following well development, following the <br /> procedures detailed below for monitoring well sampling. Depth to water measurements are <br /> made to the nearest 0.01. foot a surveyed datum (project or known) and wells are checked for <br /> separate phase product. Boreholes are sealed following water sampling. <br /> Monitoring Well Construction <br /> I . The proper permits will be obtained from the appropriate agency or Water District, using a Well <br /> Inspector as required to be present to witness the installation of the annular seal. The soils <br /> borings will be drilled with a continuous-flight hollow-stem auger of at least 3 inches Inside <br /> Diameter(ID) and 6 to S inches Outside Diameter(OD). All augers will be thoroughly steam- <br /> cleaned prior to visiting the site. The augers will be steamed cleaned between borings at a <br /> location well away from the proposed borings or adequate clean auger will be available to <br /> complete all of the wells without reusing auger sections. <br /> 2 . A geologic drilling log will be made of the materials encountered and sample depth for each <br /> boring. The soils/sediment lithology will be logged using. the Unified Soil Classification <br /> System. The log will include field descriptions of the soil lithologic variations, moisture <br /> conditions, geologic data, and any unusual characteristics which may indicate the presence of <br /> chemical contamination. <br /> 3 . The borings will be advanced to a depth of 45 feet if a saturated zone is not encountered (in <br /> absence of other depth specifications). 11' a saturated zone is encountered, the boring will <br /> advance no further than 15 feet below first encountered groundwater or 5 feet into the <br /> underlying clay aquitard. A seal will be placed in the overdrilled portion of the aquitard. <br /> 4. During the drilling operations, 55-gallon drums will be on site to contain potentially <br /> contaminated soils and rinse water. <br /> Wright Environmental Services, Inc. rev. 6/2/94 <br /> Geoscience Protocols Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.