Laserfiche WebLink
Ext+(13 ij" r. <br /> a <br /> Jim Thorpe oil , Inc. <br /> 351 N Beckman Road • P V W Lodi, CA 95241 <br /> (209) 368-6175 ! (209) 462-4581 <br /> Conirdctor's l icense 0495699 <br /> July 14, 1989 <br /> San Joequin Local Health District <br /> 1601 E Hazelton Avenue <br /> P. 0, Box 20039 <br /> Stockton , CA 95201 <br /> Re: SOIL RE-EXCAVATION AND RESAMPLE WORK PLAN <br /> 1 . A. Owner of Property Associated Adjustment Service <br /> B. Address of Site 303 1q. Pilgrim, Stockton, CA <br /> C Owner of Tank game <br /> D Contact Person E. R. Engdahl (209) 466-2821 <br /> 2. A. History of Site Site was Rainbow Bread distribution center <br /> B. Tani. Use Fuel bread trucks <br /> C. Product Regular Gasoline <br /> 403. A Groundwater Depth 65' to 69' , according to California Water Service <br /> Company at that location c`us <br /> B, Spic Removed Approximately 59 cubic yards - See Drawing "A" <br /> C Excavation History : On November 4, 1988, a 1 ,000 gallon underground gasoline <br /> tank was removed and soil samples were taken from two feet under the tank <br /> cradle, at about 10 feet. There was a strong odor of what seemed to be a pet- <br /> roleuin product. See Drawing "B" for layout of former tanK and piping Aoprox- <br /> iniately 46 cubic yards of the above excavated soil was then removed in an <br /> attempt to determine the length and breadth of the contamination. Excavation <br /> was stopped when it was obvious that a larger piece of equipment was going to <br /> be needed to affect a clean-up. <br /> 7-OMA- <br /> Soil sample analysis results showed elevated levels of TVPH and orgemilead_ <br /> Encloses! is a copy of Canonie Environmental laboratory report #85-052-5521 , <br /> dated November 21 , 1988, and Dr4wing "C" showing location of the original <br /> sample sites and the results. <br /> 4. Laboratury that will collect samples: Canonie Environmental , (209) 983-1340 <br /> A signL-0 "Release of Information Authorization" is enclosed, <br /> 5. Re-Excavation and Resample steps: At this time we are requesting a re-excavation <br /> and resample. The original excavation is open and the soil is piled on plastic <br /> on site and covered with same. We propose to open an excavation 30 feet square, <br /> starting a' south of the original excavation, extending out east and west 9 feet <br /> and from the north boundry 13 feet. We plan to excavate to a depth of 25 feet, <br /> hopefully to remove all contaminated soil from, in, and around the excavated area. <br /> The newly excavated soil will be stockpiled on site, on plastic and covered with <br /> same. We will use an excavator with a reach of approximately 25 feet and do not <br /> propose the use of a ramp at this time. <br />