My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
2420
>
2200 - Hazardous Waste Program
>
PR0515985
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:30:14 PM
Creation date
5/7/2020 2:49:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515985
PE
2220
FACILITY_ID
FA0012408
FACILITY_NAME
Heavy Transport Inc.
STREET_NUMBER
2420
Direction
E
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
2420 E EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EHD Co phance Statement <br /> STARR DROP & HOOK <br /> Jason Desalvatore <br /> 2420 E. Eight Mile Rd <br /> Stockton, CA 95210 <br /> September 28, 2011 <br /> Garret Backus or whom it may concern: <br /> I am writing this letter Ito show how we have tried to abate the code violations given to us this past <br /> month. I will itemize te violations and explain each effort to correct them. <br /> 7a Used absorbeIt is contained in a 55 gallon drum with a lid and locking seal. It has been labeled <br /> with a proper hazardo s waste label. A picture is included. <br /> - �'9M AZAHOO S WASTEi t 7 <br /> I 1 <br /> I <br /> 1 <br /> \ <br /> 1 , <br /> 7b Prior to movininto the site, the oil water separator on site was abused and neglected by <br /> previous tenants. The eparator needed to be pumped out, cleaned out, and restored with new <br /> filtration media. This i a very costly endeavor. The property owner is taking responsibility for this cost <br /> and cleanup, as I am fa ilitating the cleanup effort. The water generated from separator will be pumped <br /> into an above ground h Iding tank and reused for washing water. <br /> At this point w have had Kern Oil Filter Recycling come out and begin the cleanout process. We <br /> anticipate their completion by the 30`h of September. We should have the oil water separator functional <br /> by Oct 7. <br /> Included is a copy of an invoice for the first stage of the cleanout process, as well as pictures of the initial <br /> pump out. <br />
The URL can be used to link to this page
Your browser does not support the video tag.