Laserfiche WebLink
Inspection Report Attachment A <br /> San Joaquin County Service AFea 31 Inspection Date <br /> Flag City Wastewater Treatment Plant 14 October 2003 <br /> San Joaquin County <br /> Yn: <br /> _ • i • et. .r'0�• <br /> ?ilfl3' 1 .. 2 <br /> Head works are fully enclosed with vent to atmosphere Partial aboveground construction of primary,secondary,and <br /> no odors were observed here aerobic digester <br /> i <br /> 3 :' 11�. 4 <br /> Primary tank receives clarifier activated sludge Aerated reactor for secondary treatment oxidizes ammonia, <br /> no odors here aeration is turned off daily for anaerobic conversion,which <br /> completes the nitrogen removal process with denitrification <br /> very slight musty odor here considered normal <br /> IIS .15J I #t 6 <br /> Aeration reactor overflow basin Aeration reactor wastes sludge to the aerated digester above <br /> 1 of <br />