Laserfiche WebLink
(6) In any instance that the County or State makes the demand for partial or full tender of the <br /> financial guarantee of performance , the County and/or State may use all or any portion of the <br /> financial guarantee to reclaim the site and to recover its administrative costs associated <br /> therewith . (Development Title Section 9- 1415 . 3 [x]) <br /> p . ENFORCEMENT : Except as otherwise provided in State Mining Regulations , the County shall have <br /> authority to enforce provisions of the Surface Mining and Reclamation Act . The County may <br /> exercise all enforcement regulations available under the County Development Title and the State <br /> Public Resources Code . Such enforcement measures include charging the applicant the costs of <br /> administering an enforcement action . The basis for charging fees for an enforcement action shall be <br /> a time and materials compensation . (Development Title Section 9- 1415 . 3 [t]) <br /> q . GROUNDWATER CONDITIONS : Excavation below groundwater level is not permitted . <br /> r . NOISE : The operator shall implement the following measures to reduce the impact of <br /> construction related noise : <br /> ( 1 ) All existing and future residences shall have adequate (approximately eight feet tall with 2 : 1 <br /> slope) berm placement to prevent line of sight to the quarry . Line of sight graphics shall be <br /> V <br /> ncluded with the improvement Plan . <br /> s . RECLAMATION : The site shall be reclaimed to an agricultural use . <br /> t . MERGER : The site consists of four separate parcels . The parcels shall be merger prior to <br /> initiation of the use of the site as a quarry . <br /> 2 . DEPARTMENT OF PUBLIC WORKS (Staff Contact : Alex Chetley , 468 - 3000) <br /> a . The excavation plan shall be prepared by a registered civil engineer or land surveyor and include <br /> the following : <br /> ( 1 ) Detail of access road (first 100 feet from Harrold Avenue shall be paved) . <br /> (2) A plan of the haul route for County roads . <br /> (3) Stockpile area for top soil ( no excavation or stockpile shall be allowed within 25 feet of the <br /> property boundary or the County right- of-way) . <br /> (4) Public roads shall be kept free from mud , dirt , and gravel resulting from quarry operations . <br /> b . All private roads involved in the excavation shall be maintained to control dust . <br /> c . A video tape shall be made of the planned haul route showing conditions of all County roads . <br /> The condition of San Joaquin County maintained roads along the haul route shall be reviewed <br /> with the Department of Public Works prior to the start of excavation . (Development Title Section <br /> 9 - 1415 . 2) <br /> d . Loads on all public roads shall be required to be legal loads only . (Street and Highway Title <br /> Section 10- 2350) <br /> e . An encroachment permit shall be required for work within the road right- of-way . ( Development <br /> Title Sections 9- 1145 . 4 and 9 - 1145 . 5) <br /> f. A cash deposit or security in the amount and form acceptable to the Department of Public Works <br /> shall be filed with the Department with a guarantee that if the permittee fails , refuses , or neglects <br /> to repair, under permit , any damages to any County roads along the haul route which may result <br />