My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013242
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
27865
>
2600 - Land Use Program
>
PA-0200370
>
SU0013242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 9:49:26 AM
Creation date
5/7/2020 3:21:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013242
PE
2605
FACILITY_NAME
PA-0200370
STREET_NUMBER
27865
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
24723009
ENTERED_DATE
5/5/2020 12:00:00 AM
SITE_LOCATION
27865 E RIVER RD
RECEIVED_DATE
5/5/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
from the permittee Is operation , Public Works may do the work necessary to restore County roads <br /> along the haul route to equal or better than original condition , using the funds from said cash <br /> deposit or security . ( Development Title Section 9 - 854 . 3 ) <br /> g . A maintenance agreement to ensure that all roads designated as haul routes are maintained to a <br /> condition acceptable to San Joaquin County shall be executed by the applicant . In lieu of the <br /> maintenance agreement , a one -time road maintenance fee may be acceptable to the County . <br /> Application for the in - lieu fee may be made to the Department of Public Works . <br /> h . The Traffic Impact Mitigation Fee may be required for this development . The fee is due and <br /> payable at the time of building permit application . The fee currently is $ 164 . 86 per trip - end in the <br /> Escalon area . The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record . The number of trip- ends <br /> may be determined by a proportion to the length in time of the excavation operation . (Resolution <br /> R- 96 - 592) <br /> 3 . ENVIRONMENTAL_ HEALTH DEPARTMENT (Staff Contact : Ted Tasiopoulos , 468 - 0330) <br /> a . No excavations are permitted into the ground water table without specific approval from the <br /> Regional Water Quality Control Board , Central Valley Region (California Water Code , Chapter 4 , <br /> Article 3 , Section 13240 ) . <br /> b . The materials from an excavation shall not be deposited into any watercourse or in any way <br /> contribute to the pollution thereof (California Water Code , Section 13376 ) . <br /> c . An approved potable water supply must be provided for all employees (Development Title Section <br /> 9 - 1100 . 1 ) . <br /> d . Approved sanitary facilities must be provided for all employees ( Development Title Section 9- <br /> 1100 . 1 ) . <br /> 4 . SOUTH SAN JOAQUIN IRRIGATION DISTRICT (Staff Contact : Sam Bologna , 823 - 3101 , ext . 111 ) <br /> a . The owner shall be required to replace the existing pipeline and relocate it to a location along the <br /> outer perimeter of the excavation . <br /> b . The owner shall be required to submit plans to the district for review and approval by the South <br /> San Joaquin Irrigation District ' s Board of Directors . The following are minimum standards and <br /> conditions which shall be required to be incorporated as standards notes on the plans : <br /> ( 1 ) The land owner agrees not to perform any excavation or grading within the SSJID easement <br /> or within 15 feet of the centerline of the pipeline , whichever is greater . <br /> (2) Excavations adjacent to District easements and / or facilities shall have a minimum 3 : 1 slope <br /> from the excavated field to the top of the berm . <br /> (3) The landowner will take such steps as are required by the SSJID Water Superintendent to <br /> remedy any erosion on banks adjacent to the District ' s facilities . <br /> (4) No soil will lie stockpiled over the SSJID pipeline . <br /> (5) No heavy equipment will travel over the SSJID pipeline without approved bridging , with said <br /> bridging to be approved between SSJID and the contractor . <br /> (6) No trees and /or rubbish will be disposed of or stored on the SSJID easement or facilities . <br />
The URL can be used to link to this page
Your browser does not support the video tag.