My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013242
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
27865
>
2600 - Land Use Program
>
PA-0200370
>
SU0013242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 9:49:26 AM
Creation date
5/7/2020 3:21:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013242
PE
2605
FACILITY_NAME
PA-0200370
STREET_NUMBER
27865
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
24723009
ENTERED_DATE
5/5/2020 12:00:00 AM
SITE_LOCATION
27865 E RIVER RD
RECEIVED_DATE
5/5/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(7 ) SSJID will be notified 48 hours in advance of any excavation work . <br /> (8) The land owner agrees that the existing pipeline or concrete lined canal do not presently leak <br /> and agrees that any damage will be repaired at the land owner' s expense . <br /> (9) It is understood by the applicant that the District shall not be held responsible to remedy high <br /> water table problems created by the excavation . <br /> ( 10 ) The land owner shall provide the District with sufficient fill dirt from excavations for the <br /> protection of canal or pipeline and place the fill dirt as directed by the District ' s Engineering <br /> Department . <br /> ( 11 ) Any irrigation pipeline or service structure ( District or private) installation or modification <br /> necessitated by the proposed excavation shall be performed at the land owner' s expense . <br /> Furthermore , the owner shall obtain a Construction Permit and a Structure Permit from the <br /> District prior to installing , modifying , or removing any irrigation pipeline or structure on District <br /> facilities . Additionally , a hydraulic analysis will need to be performed to determine the proper <br /> pipe size for pipelines that are to be relocated to ensure that the same delivery head can be <br /> conveyed through the new pipeline . <br /> ( 12) New easements shall be conveyed as needed to accommodate the relocation of District <br /> facilities and to provide needed access . <br />
The URL can be used to link to this page
Your browser does not support the video tag.