Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> RA-92-5 (SA-89-25) <br /> PAGE TWO <br /> 2 . DEPARTMENT OF PUBLIC WORKS <br /> 1. The Traffic Impact Mitigation Fee will be required for <br /> this development. The fee is due and payable at the time <br /> of the building permit application. (The fee currently <br /> is $1, 373 . 00 per multi family dwelling unit in the <br /> Escalon area. If there is no building permit required, <br /> the fee will be exempt. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering <br /> News Record) (Resolution R-90-304) . <br /> 3 . AIR POLLUTION CONTROL DISTRICT <br /> 1. The District' s fugitive dust control practices shall be <br /> implemented during all grading and construction on the <br /> site. <br /> 2 . Record keeping of mitigation measures shall be maintained <br /> for inspections by District staff. <br /> 3 . The owner shall notify the District in writing one week <br /> prior to the commencement of grading and construction on <br /> the site. <br /> NOTE: A copy of the District' s letter in response to the <br /> application referral is attached for your review. <br />