Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> SU-89-19 <br /> 4 . A 27-foot wide roadway shall be dedicated along Eight-Mile <br /> Road aad-shall-be-wldeaed on the subdivided side_ to-99-feet <br /> €eery--its-eeaterlimev Pavement_shall_be widened_to_provide <br /> right_and_left_turn_lanes_on_the_approach_to_the_subdivision <br /> --- <br /> entrance-road in conformance with the structural section of <br /> an industrial street . <br /> S . Additional frontage improvements for Eight Mile Road shall be <br /> constructed in conformance with the standards for one half of <br /> a 134-foot right-of-way street . The construction of the <br /> frontage improvements may be deferred at the option of the <br /> Dep,3rtment of Public Works, in which event the owner shall <br /> execute a Deferred Frontage Improvement Agreement prior to <br /> approval of the Map (A $250.00 fee is required for processing <br /> per Ord . No . 3337 in addition to a copy of the Grant Deed and <br /> an engineer ' s estimate with a drawing of the required <br /> frontage improvements on a form to be supplied by the Public <br /> Works Department . ) <br /> 6 . 84-foot wide Irrevocable Offers to Dedicate shall be made <br /> for all future public roadways , and they shall line up with <br /> the planned interior streets . A_42=foot_wide_right=of=waY <br /> Dedication_shall_be_made_along_the_westerly_line_of <br /> Lots_"C_'_and_"D"_ _The_constructicn_of_the_frontage <br /> improvements_along_ _ <br /> thenortherly_line_of lot_D_is_reguired <br /> r'iit_may-be_deferred_at_the_option_of_the_Department_of_Public <br /> Works,_in_which-event_the_owner_shall_execute_3_Deferred <br /> Frontage_?mprovement_Agreement_prior-to_approval_of__the Map <br /> 250_n0_fee _-reSLii=od_for_oroj_essing_per_Ord__No__3337 <br /> in addition_to_.aco.2E_ f- the_grant_7D-e--d_and_an_eDSine-t'r_s <br /> mate_wi±h_a_drawing_��f_the reguired_frontage_improvements <br /> on_aform_to_be_supplied_by_the_Public_Works_Department_l <br /> 7 . A community detention pond/terminal drainage system shall <br /> be provided to meet the requirements of the County and the <br /> State Reclamation Board and to provide adequate drainage for <br /> the subdivision. Bear Creek right-of-way shall be shown and <br /> a permit from the State Reclamation Board shall be acquired . <br /> 8 . The project shall be served by a public water system <br /> conforming to the requirements of the Local Health District <br /> and the Department of Public Works . The system shall provide <br /> adequate domestic and fire water supply in conformance to the <br /> requirements of the County Fire Warden and the local Fire <br /> District . A test well showing that the production well will <br /> meet all applicable standards is required prior to the <br /> approval of the improvement plans or any work within the <br /> site . <br /> 2 <br />