My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013248
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
17749
>
2600 - Land Use Program
>
QX-90-1
>
SU0013248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:21 AM
Creation date
5/8/2020 10:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013248
PE
2600
FACILITY_NAME
QX-90-1
STREET_NUMBER
17749
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
Zip
95227-
APN
01922024
ENTERED_DATE
5/6/2020 12:00:00 AM
SITE_LOCATION
17749 E HWY 88
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ff. The applicant shall pay a fee, as specified in Planning <br /> Title Section 9-2244 (s) , to the County to cover the cost <br /> of an annual inspection of the excavation to assure <br /> compliance with the provisions of the permit. <br /> gg. Operations shall be in accordance with instructions from <br /> the Agricultural Commissioner to control the spread of <br /> noxious weeds. Evidence of the Agricultural <br /> Commissioner' s approval of the Weed Control Plan shall be <br /> submitted to the Planning Division. <br /> hh. The excavation shall not cause health or sanitary hazards <br /> and shall not create conditions which will cause the <br /> breeding or increase of mosquitoes, rodents, or other <br /> pests. <br /> ii. A performance guarantee is required to ensure site <br /> rehabilitation and compliance with Conditions of <br /> Approval. The amount of the guarantee is and will be <br /> fully in force for any phase which is being excavated. <br /> The estimated cost of rehabilitating each phase must be <br /> reviewed by the Department of Public Works. The type of <br /> financial guarantee proposed by the applicant under this <br /> Section must be found acceptable by County Counsel. <br /> 2 . DEPARTMENT OF PUBLIC WORKS: <br /> Conditions of Approval: <br /> a. The excavation plan shall be prepared by a Registered <br /> Civil Engineer and include the following: <br /> (1) Provide details of the Mokelumne River crossing. <br /> Any work in the river shall require San Joaquin <br /> County Flood Control District approval, State <br /> Reclamation Board Permit, and all other affected <br /> agency permits. <br /> (2) The final grading plan shall include alternate <br /> drainage provisions and final slopes as required by <br /> the Environmental Impact Report. At the completion <br /> of the excavation operation, provision shall be <br /> made to connect the project drainage pond to the <br /> existing County (Solari) pond and dedicate the <br /> project pond to the County. <br /> (3) Provide the boundaries and quantities of excavation <br /> of each phase and direction of excavation. <br /> 3 . PUBLIC HEALTH SERVICES: <br /> Ordinance Requirements: <br /> -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.