Laserfiche WebLink
RESPONSE TO COMMENTS FROM: The Reclamation Board <br /> 1. The EIR has been revised to reflect the requirement that relocation of the bridge <br /> would require a permit from the Board of Reclamation (see Mitigation 2, Section <br /> 3.2.3). <br /> 1 <br />