Laserfiche WebLink
PC: 9-6-90 <br /> QX-90-1 <br /> compliance with the provisions of the permit. <br /> gg . Final elevations within 25 feet of any property boundary <br /> shall be equal to or greater than the abutting property <br /> unless the elevation prior to excavation is less than <br /> that of the abutting property, in which case the <br /> differential shall not be increased. <br /> hh. Operations shall be in accordance with instructions from <br /> the Agricultural Commissioner to control the spread of <br /> noxious weeds . Evidence of the Agricultural <br /> Commissioner ' s approval of the Weed Control Plan shall <br /> be submitted to the Planning Division. <br /> ii . The excavation shall not cause health or sanitary hazards <br /> and shall not create conditions which will cause the <br /> breeding or increase of mosquitoes , rodents , or other <br /> pests . <br /> jj . A performance guarantee is required to ensure site <br /> rehabilitation and compliance with Conditions of <br /> Approval . The amount of the guarantee is and will be <br /> fully in force for any phase which is being excavated . <br /> The estimated cost of rehabilitating each phase must be <br /> reviewed by the Department of Public Works . The type of <br /> financial guarantee proposed by the applicant under this <br /> Section mmust be found acceptable by County Counsel . <br /> 2 . DEPARTMENT OF PUBLIC WORKS : <br /> Conditions of Approval : <br /> a. The excavation plan shall be prepared by a Registered <br /> Civil Engineer and include the following: <br /> (1) Provide details of the Mokelumne River crossing. <br /> Any work in the river shall require San Joaquin <br /> County Flood Control District approval, State <br /> Reclamation Board Permit, and all other affected <br /> agency permits. <br /> (2) The final grading plan shall include alternate <br /> drainage provisions and final slopes as required by <br /> the Environmental Impact Report. At the completion <br /> of the excavation operation, provision shall be made <br /> to connect the project drainage pond to the existing <br /> County (Solari) pond and dedicate the project pond <br /> -43- <br />