Laserfiche WebLink
Mr. Harlin Knoll Project 20939-011.001 <br /> April 8, 1998 <br /> Page 3 <br /> Task 4 - Data Interpretation and Report Preparation <br /> EMCON will prepare a brief report after the field activities az completed and the <br /> analytical results are received. The report will document the find ngs and transmit the <br /> analytical results. The report will include the following: <br /> • A discussion of procedures implemented during the subsurface investigation <br /> • A discussion of the subsurface findings <br /> • Soil and groundwater analytical results, including copies of certified analytical <br /> reports <br /> • Exploratory boring logs <br /> SCHEDULE <br /> Field activities are scheduled for April 14, 1998. The field activities should require 1 day to <br /> complete. Analytical results should be available approximately 1 week after the samples <br /> have been submitted for chemical analysis. A report will be submitted approximately 3 days <br /> after analytical results are received from the laboratory. <br /> Please call if you have questions. <br /> Sincerely, <br /> 4� XR. <br /> arles S. Metzinger J. C. Isham, RG, CEG, C FIG <br /> Project Manager Geology Manager <br /> Attachment: Health and Safety Plan <br /> SA0N�PJM3M390110.1 AS-98\pmm=ec3 <br />