My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
0
>
2900 - Site Mitigation Program
>
PR0507793
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 11:44:38 AM
Creation date
5/8/2020 11:24:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0507793
PE
2960
FACILITY_ID
FA0007764
FACILITY_NAME
COUNTY RIGHT OF WAY
STREET_NUMBER
0
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
CURRENT_STATUS
01
SITE_LOCATION
THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Harlin Knoll Project 20939-011.001 <br /> April 8, 1998 <br /> Page 3 <br /> Task 4 - Data Interpretation and Report Preparation <br /> EMCON will prepare a brief report after the field activities az completed and the <br /> analytical results are received. The report will document the find ngs and transmit the <br /> analytical results. The report will include the following: <br /> • A discussion of procedures implemented during the subsurface investigation <br /> • A discussion of the subsurface findings <br /> • Soil and groundwater analytical results, including copies of certified analytical <br /> reports <br /> • Exploratory boring logs <br /> SCHEDULE <br /> Field activities are scheduled for April 14, 1998. The field activities should require 1 day to <br /> complete. Analytical results should be available approximately 1 week after the samples <br /> have been submitted for chemical analysis. A report will be submitted approximately 3 days <br /> after analytical results are received from the laboratory. <br /> Please call if you have questions. <br /> Sincerely, <br /> 4� XR. <br /> arles S. Metzinger J. C. Isham, RG, CEG, C FIG <br /> Project Manager Geology Manager <br /> Attachment: Health and Safety Plan <br /> SA0N�PJM3M390110.1 AS-98\pmm=ec3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.