My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2900 - Site Mitigation Program
>
PR0507911
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 11:47:35 AM
Creation date
5/8/2020 11:30:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507911
PE
2950
FACILITY_ID
FA0007834
FACILITY_NAME
CIRCLE K #8671
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�I 05 / 11 / 98 MON 14 : 22 FAX 918 384 1889 SECOR— SACRAMENTO I� OOJ <br /> Toaco Marketing Comply 3 <br /> Circle K Srn ee Station 8671, Stockton, CA Mny 11, 1998 <br /> Laboratory Procedures <br /> Soil samples collected during product line and dispenser upgrade activities will be <br /> submitted to the laboratory and analyzed for the presence of total petroleum <br /> hydrocarbons calculated as gasoline (TPH-g), benzene, toluene, ethylbenzene, xylenes <br /> (BTEX compounds), and methyl tertiary butyl ether (MtBE) by EPA Methods 8015 and <br /> 8020. In addition, one selected soil sample collected from beneath the dispensers will be <br /> analyzed for fuel oxygenates by EPA Method 8260. <br /> Reporting and Schedule <br /> SECOR anticipates initiating field activities during May 1998 . After completion of the <br /> field work and laboratory analyses, the data will be evaluated and assembled into a <br /> report. Included in the report will be soil analytical results, chain-of-custody <br /> documentation, a summary of field observations, assessment, and conclusions. This <br /> report will be submitted to the SJCEHD within 6 to 8 weeks of receiving analytical <br /> sample results from the laboratory. <br /> If there are any questions regarding the contents of this addendum to work plan, please <br /> call us at (916) 3644880, <br /> Sincerely, <br /> SECOR International Incorporated <br /> ....= <br /> Rusty E. Benko Z<.{% <br /> Project Enginertr �� ` ,. an <br /> Ct a a <br /> Q BARCLAY <br /> Greg Barclay `f y <br /> Senior Geologist lrt� <br /> RG 6260 <br /> Attachments' Figure 1 - Site Map <br /> Attachment A - Field and Laboratory Procedures <br /> cc: Mr. Ed Ralston, Tosco Marketing Company <br /> Ms. Elizabeth Thayer, RWQCB - Central Valley Region <br /> 7088&0104 1/addendum.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.