Laserfiche WebLink
9255517888 Line '5:31:49 11-08-2012 3;4 <br /> t <br /> 6ETTifR-RYAN INC. GR Job# 20-582390 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 330.01 <br /> Complete the following checklist: <br /> Yes ❑ o Is the audible alarm operational? <br /> (-8 Yes ❑ No' Is the visual alarm operational? <br /> ❑ Yes F. No' Were all sensors visual;y inspected,functionally tested,and confirmed operational? <br /> Yes ❑ No" Were all sensors installed at lowest point of secondary containment and positioned so that other equipment vnll not interfere with their <br /> proper o erabon? <br /> ❑ Yes ❑ No' if alarms are relayed to a remote monitoring station,is all communication equipment(e.g.modem)operational? <br /> E N/A <br /> ❑ Yes lj No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system <br /> Ix N/A detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors Initiate positive shut-down?(Check all that apply) <br /> ❑ Sump french Sensor; © Dispenser Containment Sensor.Did you confirm positive shut-down due to leaks and sensor <br /> faiture/disconnection? ❑ Yes; ❑ No. <br /> ❑ Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(Le.no mechanical overfill prevention <br /> E NA valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If so,a1 what percent <br /> of tank capacity does the alarm trigger? <br /> Yes No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes C No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) ❑Product; ❑Water. If <br /> yes,describe causes In Section E,below. <br /> Yes [] No' Was monitoring system set-up reviewed to Insure proper settings?Attach set-up reports,if applicable. <br /> [j Yes Q No' I Is all monitoring equipment operational per manufacture's specifications? <br /> "In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Only tested diesel fill sump to recert new sensor. <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 <br />