Laserfiche WebLink
9255517888 Line 1 '5:32:10 11-08-2012 4/4 <br /> i <br /> �6.TTLER-RYAN INC. GR Job# 20-582390 <br /> F. In-Tank Gauging 1 SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-lank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes ❑ o Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No' Was accuracy of system products level readings tested? <br /> (] Yes [] No' Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> 11 Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ es No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(check all <br /> ❑ NIA that apply) Simulated leak rate: ❑ 3 g.p.h. ❑ 0.1 g.p.h. ❑ 0.2 g.p.h. <br /> ❑ Yes C7 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For Mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut orf if the LLD detects a leak? <br /> ❑ N/A <br /> (] Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ❑ NIA Disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> (] N/A fails a test? <br /> [] Yes ❑ No* For e'-ectronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ NIA <br /> ❑ Yes I No* 1were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these cleric envies were or will be corrected. <br /> G. Comments: <br /> Only tested diesel fill sump sensor. <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 <br />