Laserfiche WebLink
i <br /> i <br /> "ALTERNATIVE BID"ITEMS: <br /> Item Estimated Description & Unit Price <br /> No. Quantic (Written In Words & Figures)- Total <br /> B1. 1 LS Design and Construction of the Lewis $ f <br /> Manor Production Well (1,000 feet deep <br /> with 550 ft. of blank casing, 450 ft. of full flow <br /> louvers instead of wire wrap screening, 300 ft. <br /> of sanitary seal, & 700 ft. of gravel pack) <br /> (WOULD REPLACE BID ITEM NO. 1),at <br /> Dollars <br /> and. cents per Lump Sum <br /> 132- 1 LS Design and Construction of the Multiple $ <br /> Completion (Nested) Monitoring Well (with <br /> full flow louvers instead of wire wrap screens) <br /> (WOULD REPLACE BID ITEM NO. 2) at <br /> Dollars <br /> ' and cents per Lump Sum <br /> Notes: <br /> i <br /> 1. The Contract will be compared and awarded on the basis of the Total <br /> "Base Bid" Price. <br /> 2. The City reserves the right to award the "Base Bid" Contract with or without any <br /> combination of the "Alternative Bid" items, based upon the availability of,revenue. <br /> 3. The City reserves the right to reject any and all bids for any reason whatsoever. <br /> 4. Issuance of the "Notice to Proceed" will constitute the beginning of the Contract. <br /> DIVISION IV 7D "Revised - 5/17100", <br /> �i <br />