My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
902
>
2900 - Site Mitigation Program
>
PR0516350
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:33:52 PM
Creation date
5/8/2020 12:01:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516350
PE
2950
FACILITY_ID
FA0012574
FACILITY_NAME
LEWIS MANOR - MUNI MW (4)
STREET_NUMBER
902
Direction
W
STREET_NAME
12TH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23229069
CURRENT_STATUS
02
SITE_LOCATION
902 W 12TH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i, <br /> The Contractor shall be required to comply with the applicable provisions of the <br /> California Construction Safety Orders when working anywhere on this project.. <br /> Full compensation for conforming to the requirements of this section, not otherwise <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed. <br /> SECTION 25 -SUPERVISIONF <br /> O WORK <br /> The Contractor shall employ a superintendent on site for coordination of all work with the <br /> City and neighboring property owners. Prior approval of the Superintendent will be <br /> required from the City and the City reserves the right to request appropriate`replacement <br /> of the Superintendent any time during construction of the project. <br /> Due to the high degree of ongoing coordination with the City, the Contractor shall . <br /> provide the superintendent's, or other company contact person's, name and phone <br /> number to be used after construction hours and in an emergency. The City requires the <br /> Contractor's immediate mitigation of any project related traffic or other safety issue 24 <br /> hours a day. <br /> t <br /> Full compensation for conforming to the requirements of this section, not otherwise E <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed. <br /> SECTION 26 -STAGING OF CONSTRUCTION <br /> The Contractor shall prepare and submit at the pre-construction meeting, to be reviewed <br /> and approved of by the Engineer, a staging or phasing plan identifying the sequence of <br /> construction work and traffic control needed to complete the project. If possible, the <br /> staging plan should identify variousalternate methods to complete the project. The <br /> r Engineer's approval of the staging plan will be required prior to the start of construction. <br /> Full compensation for conforming to the requirements of this section, not otherwise <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed. <br /> a <br /> �j <br /> DIVISION 11-11 Special Requirements <br />
The URL can be used to link to this page
Your browser does not support the video tag.