My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
902
>
2900 - Site Mitigation Program
>
PR0516350
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:33:52 PM
Creation date
5/8/2020 12:01:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516350
PE
2950
FACILITY_ID
FA0012574
FACILITY_NAME
LEWIS MANOR - MUNI MW (4)
STREET_NUMBER
902
Direction
W
STREET_NAME
12TH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23229069
CURRENT_STATUS
02
SITE_LOCATION
902 W 12TH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. SPECIAL PROVISIONS <br /> SECTION 1 - DESCRIPTION OF WORK: <br /> In general, the work to be done consists of (1) designing, drilling, and equipping a new <br /> production well and multiple completion (nested) monitoring well that includes installing <br /> the casings and gravel packs, electrical components, piping and related site work, <br /> development and testing; (2) destruction of three abandoned production wells that <br /> includes filling, sealing, and capping; (3) destruction of two well pump houses and their <br /> related appurtenances, along with any other items of work that are required by the <br /> project plans, Standard Specifications, or these special provisions. <br /> SECTION 2 - SUBMITTALS: <br /> Specified product items and proposed equivalent ("or equal") items must be submitted <br /> for the Engineer's approval and shall include adequate technical information to fully <br /> describe the function and quality of the item(s). The Contractor shall indicate whether <br /> the submittal is a requited product item specified in the Contract Documents (i.e. <br /> equipment, shop drawings, samples, or for product information only) or for product <br /> review of proposed equivalents. Six copies of the submittals, along with the <br /> Manufacturers' Affidavits for items specified in the Contract Documents, is required_ <br /> `a The Engineer's approval of submittals shall not relieve the Contractor from the <br /> responsibility of meeting the requirements of the Contract Documents. The Engineer's <br /> review of submittals is for compliance with the design intent and requirements of the <br /> Contract Documents. If later information reveals that work or items submitted or <br /> furnished do not meet the requirements of the Contract Documents or the Work as a <br /> whole, the Engineer's favorable review shall be void and the items or work shall be <br /> considered defective. The Contractor shall not perform work for which reviewed <br /> submittals are required without obtaining approval of those submittals. <br /> The Contractor shall make the submittals in time to allow for the Engineer's review and <br /> resubmittal, if required, without causing delay to the Work. The Contractor shall review, <br /> stamp, date, and sign submittals before sending them to the Engineer. By making such <br /> +r a submittal, the Contractor makes the following warranty and shall include these <br /> warranty statements on the letter of transmittal. The Contractor warrants that: <br /> �• 1. All equipment, product items, and proposed equivalent items submitted meet the <br /> requirements of the Contract Documents and are equal in quality, utility, and <br /> appearance to the originally specified item, or else any deviations are identified <br /> �. in a separate letter accompanying the submittal; <br /> 2. All work or items submitted have been coordinated with and meet the <br /> r.. requirements of other submittals, field conditions, and the work as a whole; <br /> 3. Adjustments to other work required to accommodate the proposed equivalent <br /> items have been delineated on the submittal and will be made at the Contractors <br /> expense; <br /> Division III- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.