Laserfiche WebLink
�. 5. Data sheets, catalogue pages, brochures, shop drawings, samples, performance <br /> charts, instructions, and other information pertaining to the specified equipment, <br /> products, or proposed equivalents have been highlighted on the submittals and <br /> ., have been certified, as required, by the Contractor to indicate their compliance with <br /> some portion of the work; <br /> When the specified item is followed by an "or equal," the Contractor may submit <br /> proposed equivalent items for the Engineer's review. Where the term "or equal" is <br /> omitted, it means that the named item is required to meet the City's needs, and no <br /> products or makers other than those specified will be considered. <br /> Measurement and Payment <br /> Full compensation for conforming to the requirements of this section, not otherwise <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed. <br /> SECTION 3 - ENVIRONMENTAL PROTECTION: <br /> The Contractor shall develop an Environmental Protection Plan (EPP) and submit it to <br /> the Engineer within five (5) days from the date of the Notice to Proceed. The <br /> Environmental Protection Plan shall include, but not limited to, the following items: <br /> 1. Copies of all required permits; <br /> 2. Proposed sanitary landfill site; <br /> `' 3. Other proposed disposal sites; <br /> 4.• Copies of any agreements with public or private landowners regarding <br /> equipment, materials storage, borrow sites, fill sites, or disposal sites. Any such <br /> agreement made by the Contractor shall be invalid if its execution causes <br /> violation of local or regional grading or land use regulations. <br /> +� All of the Contractor's operations shall comply with all federal, state, and local <br /> regulations pertaining to water, air, solid waste, and noise pollution. At all times, special <br /> measures shall be taken to prevent oily or other hazardous substances from being <br /> deposited on the ground or entering the storm drain system. Any soil or water which is <br /> contaminated due to the Contractor's operations shall be disposed of in accordance with <br /> applicable regulations. This includes petroleum products, bituminous materials, salts, <br /> +-• acids, alkalies, herbicides, pesticides, disinfectants, organic chemicals and inorganic <br /> wastes (i.e. paint, paint thinner, solvents, motor oil, fuels, resins and other substances). <br /> No dumping of surplus concrete or grout on the site will be permitted. <br /> w. <br /> Water containing mud or silt resulting from the Contractor's operations shall be treated <br /> by filtration, or retention in a settling pond, adequate to prevent muddy water from <br /> �. entering the City storm drainage system. <br /> The Contractor shall keep noisy equipment as far as possible from noise-sensitive site <br /> boundaries and shall use electric power in lieu of internal combustion engine power <br /> wherever possible. If non-complying noise levels are found, the Contractor shall be <br /> responsible for correcting the excessive noise. <br /> Division III-2 <br /> 1.. <br />