L. <br /> s. water, such equipment to be a water meter. To measure the elevation of <br /> the water level in the well, an air test line complete with calibrated gauge <br /> activated by compressed air shall be furnished by the Contractor. <br /> Unless otherwise permitted, the air line shall be securely fastened to the <br /> pumping unit and shall terminate approximately at the maximum desired <br /> pumping depth but shall in no case be nearer than two feet to the end of <br /> Lo the suction pipe. <br /> 5. The Contractor shall furnish all labor, fuel and incidental materials <br /> required for the completion and duration of the test as specified below. <br /> C. Testing <br /> 1. Step Test: To be run at the rates of production and duration of times as <br /> directed by the Engineer. A minimum of four tests of 4-hour duration <br /> shall be performed, each at a consecutively higher rate than the <br /> previous. The pumping rates shall be 1,000, 2,000, 3,000, and 4,000 <br /> LW gpm, unless the Engineer approves other rates recommended by the <br /> Contractor. <br /> 2. Continuous Test: After the step test and a 24-hour recovery period, the <br /> testing of the well shall proceed in a single continuous uninterrupted <br /> operation for a 24-hour period. The rate for the 24-hour test shall be the <br /> design rate for the well, unless another rate is specified by the Engineer <br /> L" on the basis of the step test. Should the testing period cease at any <br /> time or for any reason before the 24-hour testing period is complete, the <br /> testing shall begin again and proceed for a continuous 24-hour period at <br /> �. no additional cost to the City. If stability has not been achieved after the <br /> 24-hour continuous test, an additional 24-hour test shall be performed, <br /> and shall be paid for with a Contract Change Order. <br /> D. Procedure: <br /> +.� 1. The conditions that must be achieved by the end of the development and <br /> testing period are: <br /> a. Sand production not more than 5 parts per million. <br /> w. b. Turbidity of 5 Nephelometric Turbidity Units (NTU) maximum. <br /> c. Quantity of gravel placed in the annular space shall be at least equal <br /> to the calculated volume of the annular space. <br /> �.. d. No further settling of the gravel envelope. <br /> 2. Prior to starting each pumping test, the static water level in the well shall <br /> be determined. The pump shall be started and operated, at each <br /> successive rate, without stopping until the water level in the well <br /> stabilizes and there continuously for a minimum period of time designated <br /> ,. by the Engineer. <br /> 3. During all test procedures measurements shall be taken to determine the <br /> water level in the well and the rate of pumping. These measurements <br /> shall be obtained from the Production Well every 60 seconds for the first <br /> 10 minutes of each test, every two minutes for the next 10 minutes, <br /> every five minutes for the next 40 minutes, every 15 minutes for the next <br /> w. <br /> Division III -29 <br />