Laserfiche WebLink
Monitoring Well In$tallation Wo an, Order No. 5-01-172 - <br /> Monitoring Well Installation Repo7r <br /> Thickness of concrete grout <br /> Boring diameter <br /> Casing diameter <br /> Casing material <br /> Size of perforations <br /> Number of bags of sand <br /> Well elevation at top of casing <br /> Depth to ground water <br /> Date of water level measurement <br /> Monitoring well number <br /> Date drilled <br /> Location <br /> Well Development: <br /> B. W 11 D lopm nt. <br /> Date(s) of development of each well <br /> Method of development <br /> Volume of water purged from well <br /> How well development completion was determined <br /> Method of effluent disposal <br /> Field notes from well development should be included in report. <br /> C. Well Surveying:provide reference elevations for each well and surveyor's notes <br /> D. Water Sampling: <br /> Date(s) of sampling <br /> How well was purged <br /> How many well volumes purged <br /> Levels of temperature, EC, and pH at stabilization <br /> Sample collection,handling, and preservation methods <br /> Sample identification <br /> Analytical methods used <br /> Laboratory analytical data sheets <br /> Water level elevation(s) <br /> Groundwater contour map <br /> E. Soil Sampling (if applicable): <br /> Date(s) of sampling <br /> Sample collection, handling, and preservation method <br /> Sample identification <br /> Analytical methods used <br /> Laboratory analytical data sheets <br /> C:V'rojmt PilaFOAMSmo¢well requ RLdoc <br />