Laserfiche WebLink
SPCC Amendment Number 1 <br /> Description of amendments. <br /> 1 Changes to the Branch Mans er status 10-9-12 <br /> Addition of contact information for clean- up contractors 10-9-12 <br /> SPCC Amendment Number 2 <br /> 1) Chan;es to the Branch Manager Status 10-29-15 <br /> SPCC Amendment Number 3 <br /> 1) Plan Review 6-4-19 <br /> 2 y ia-er/ShOI3 Foreman Status. Servando Pineda is the new Service Manager <br /> )1_ Removed AST#5 275 gal tank: from plan transmission oil <br /> 4) Removed gear oil drums 165 al <br /> Changed AST# 4 H draulic oil ca acit y from 600 to 165 al <br /> 6 Changed AST#3 engine oil capacity from 570 to 400 gal <br /> 7) Changed total cMacijy in TABLE 3 to 11,730 gal <br /> SPCC Amendment Number 4 <br /> 1 Plan Review 5-14-20 <br /> 2 Removed 10.000 AST Diesel tank from the property. Awaiting ac uisition of re lacement tank <br /> 3 Changed total ca acity in TABLE 3 to 1,730 gal endin acq uisition of re laeement 10,000 gal AST <br /> 4 Pressure test conducted 3-10-20 on underground lines waste oil by Dunlee Pumping <br /> SPCC Amendment Number 5 <br /> Plan Review 6-3-20 <br /> 2). Made changes and removed the following from pae 12: 570 gal. 600 gal and 275 gal tanks <br /> 3). Made changes to pagg 14 item 43 "periodic inteari ty testing"to state that the 10,000 gal is periodically <br /> inspected by an outside certified tank inspector following <br /> the steel tank institute j STI) standard. <br />