Laserfiche WebLink
Management Approval <br /> This amendment to the SPCC Plan has the full approval of Maxim Crane Works management. Maxim <br /> Crane Works has committed the necessary resources to implement the measures described in this amendment. <br /> �c/ar\ s / 12020 <br /> Shop Supervisor Signature :name(printed) Date <br /> Professional Engineer Certification <br /> The undersigned Registered Professional Engineer is familiar with the requirements of 40 CFR 112 and <br /> has visited and examined the facility,or has supervised examination of the facility by appropriately qualified <br /> personnel. The undersigned Registered Professional Engineer attests that this Spill Prevention, Control, and <br /> Countermeasure Plan, as amended, has been prepared in accordance with good engineering practice, including <br /> consideration of applicable industry standards and the requirements of 40 CFR 112; that procedures for required <br /> inspections and testing have been established; and that this Plan is adequate for the facility. (40 CFR 112.3(d)) <br /> This certification in no way relieves the owner or operator of the facility of his/her duty to prepare and <br /> fully implement this SPCC Plan in accordance with the requirements of 40 CFR 112. This Plan is valid only to <br /> the extent that the facility owner or operator maintains, tests, and inspects equipment, containment, and other <br /> devices as prescribed in this Plan. <br /> No.�.`5 T59 <br /> 71;20 zo <br /> igne Date CIV Exp. <br /> aturt� �bE <br /> S� C1V1L �� <br /> OF( <br />