My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2373
>
2800 - Aboveground Petroleum Storage Program
>
PR0523161
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 2:58:18 PM
Creation date
5/8/2020 1:25:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0523161
PE
2832
FACILITY_ID
FA0009394
FACILITY_NAME
MAXIM CRANE WORKS
STREET_NUMBER
2373
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
2373 E Mariposa Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 5 <br /> TANK LOADING/UNLOADING PROCEDURES <br /> II Stage Tasks II <br /> Prior to Visually check all hoses for leaks and wet spots. <br /> loading/ Verify that sufficient volume is available in the storage tank or truck. <br /> Lock in the closed position all drainage valves of the secondary <br /> unloading containment structure. <br /> Ensure that the vehicle's parking brakes are set. <br /> Verify proper alignment of valves and proper functioning of the pumping <br /> system. <br /> If filling a tank truck, inspect the lowermost drain and all outlets. <br /> Establish adequate bonding/grounding prior to connecting to the fuel <br /> transfer point. <br /> During Driver must stay with the vehicle at all times during loading/unloading <br /> activities. <br /> loading/ Periodically inspect all systems, hoses and connections. <br /> unloading When loading, keep internal and external valves on the receiving tank open <br /> along with the pressure relief valves. <br /> When making a connection, shut off the vehicle engine. <br /> Monitor the liquid level in the receiving tank to prevent overflow. <br /> Monitor flow meters to determine rate of flow. <br /> When topping off the tank, reduce flow rate to prevent overflow. <br /> After loading/ Make sure the transfer operation is completed. <br /> unloading Close all tank and loading valves before disconnecting. <br /> Securely close all vehicle internal, external, and dome cover valves before <br /> disconnecting. <br /> Secure all hatches. <br /> Disconnect grounding/bonding wires. <br /> Make sure the hoses are drained to remove the remaining oil before moving <br /> them away from the connection. Use a drip pan. <br /> Cap the end of the hose and other connecting devices before moving them <br /> to prevent uncontrolled leakage. <br /> Inspect the lowermost drain and all outlets on tank truck prior to departure. <br /> If necessary, tighten, adjust, or replace caps, valves, or other equipment to <br /> prevent oil leaking while in transit. <br /> -18- <br />
The URL can be used to link to this page
Your browser does not support the video tag.