My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2373
>
2800 - Aboveground Petroleum Storage Program
>
PR0523161
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 2:58:18 PM
Creation date
5/8/2020 1:25:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0523161
PE
2832
FACILITY_ID
FA0009394
FACILITY_NAME
MAXIM CRANE WORKS
STREET_NUMBER
2373
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
2373 E Mariposa Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPCC Amendment Number 1 <br /> Description of amendment <br /> 1) Changes to the Branch Manager status 10-9-12 <br /> 2) Addition of contact information for clean- up contractors 10-9-12 <br /> SPCC Amendment Number 2 <br /> 1) Changes to the Branch Manager Status 10-29-15 <br /> SPCC Amendment Number 3 <br /> 1) Plan Review 6-4-19 <br /> 2) Change to Service Manager/Shop Foreman Status, Servando Pineda is the new Service Manager <br /> 3) Removed AST#5 275 gal tank from plan (transmission oil) <br /> 4) Removed gear oil drums (165 gal) <br /> 5) Changed AST#4 Hydraulic oil capacity from 600 to 165 gal) <br /> 6) Changed AST#3 engine oil capacity from 570 to 400 gal <br /> 7) Changed total capacity in TABLE 3 to 11,730 gal <br /> SPCC Amendment Number 4 <br /> 1) Plan Review 5-14-20 <br /> 2) Removed 10,000 AST (Diesel tank) from the property. Awaiting acquisition of replacement tank <br /> 3) Changed total capacity in TABLE 3 to 1,730 gal (pending acquisition of replacement 10,000ag 1 AST <br /> 4) Pressure test conducted 3-10-20 on underground lines (waste oil) by Dunlee Pumping <br /> Management Approval <br /> This amendment to the SPCC Plan has the full approval of Maxim Crane Works management. Maxim <br /> Crane Works has committed the necessary resources to implement the measures described in this amendment. <br /> Shop Supervisor Signature Name (printed) Date <br /> Professional Engineer Certification <br /> The undersigned Registered Professional Engineer is familiar with the requirements of 40 CFR 112 and <br /> has visited and examined the facility, or has supervised examination of the facility by appropriately qualified <br />
The URL can be used to link to this page
Your browser does not support the video tag.