Laserfiche WebLink
personnel. The undersigned Registered Professional Engineer attests that this Spill Prevention, Control, and <br /> Countermeasure Plan, as amended, has been prepared in accordance with good engineering practice, including <br /> consideration of applicable industry standards and the requirements of 40 CFR 112; that procedures for required <br /> inspections and testing have been established; and that this Plan is adequate for the facility. (40 CFR 112.3(d)) <br /> This certification in no way relieves the owner or operator of the facility of his/her duty to prepare and <br /> fully implement this SPCC Plan in accordance with the requirements of 40 CFR 112. This Plan is valid only to <br /> the extent that the facility owner or operator maintains, tests, and inspects equipment, containment, and other <br /> devices as prescribed in this Plan. <br /> Signature Date P.E. Seal <br /> APPENDIX B <br /> OIL SPILL CONTINGENCY PLAN <br />