Laserfiche WebLink
ti. .. <br /> 04 Ocotber 2000 <br /> AGE-NC Project No. 00-0768 <br /> Page 2 of 7 <br /> Toluene, ethylbenzene and xylenes were present in the same samples analyzed at concentrations as <br /> high as 42 mg/kg 4,700 mg/kg and 27,100 mg/kg, respectively. The analytical soil results can be <br /> found in Appendix A. <br /> 2.3. PREVIOUS INVESTIGATIONS <br /> On 19 March 1991 the former UST pit was overexcavated to a depth of 14 feet bsg. Approximately <br /> 750 cubic yards of soil was removed from the former UST pit. Six sidewall and four bottom samples <br /> were collected from the finished excavation. Six sidewall and four stockpile soil samples were <br /> submitted for analysis. TPH-g was detected in soil samples LCSS-WW-8', LC-SP1, LC-SP3 and <br /> LC-SP4 at concentrations of 11 mg/kg, 68 mg/kg, 1.8 mg/kg and 19 mg/kg, respectively. Benzene, <br /> toluene,ethylbenzene and xylenes(BTEX)compounds,with the exception of benzene were detected <br /> in six of the ten soil samples at concentrations ranging from 0.013 mg/kg (toluene) to 15 mg/kg <br /> (xylenes). The analytical soil results can be found in Appendix A. <br /> On 27 March 1991 three ground water monitoring wells (MW-1 through MW-3)were installed at <br /> the site. Soil samples were collected at 5.5 feet and 10.5 feet bsg in monitoring well pilot borings <br /> MW-1 through MW-3. Soil samples were analyzed for TPH-g and BTEX compounds. None of the <br /> soil samples analyzed contained concentrations of TPH-g or BTEX compounds above the laboratory <br /> reporting limits. The analytical soil results can be found in Appendix A. <br /> On 27 February 1992 three additional ground water monitoring wells (MW-4 through MW-6)were <br /> installed at the site. Soil samples were collected at 5 feet, 10 feet, 15 feet and 20 feet bsg in <br /> monitoring well pilot boring MW-4, and at 15.5 feet bsg in monitoring well pilot borings MW-5 and <br /> MW-6.Soi1 samples were analyzed for TPH-g and BTEX compounds. None of the soil samples <br /> analyzed contained concentrations of TPH-g or BTEX compounds above the laboratory reporting <br /> limits.The analytical soil results can be found in Appendix A. <br /> From April 1991 to December 1995 the ground water monitoring well network on site was sampled <br /> on a quarterly basis. The last two monitoring events conducted in September 1995 and December <br /> 1995 showed nondetectable levels of contamination and closure of the site was requested. Analytical <br /> result of ground water samples collected from April 1991 to December 1995 can be found in <br /> Appendix A. <br /> On 13 February 1996 San Joaquin County PHS-EHD concurred with the closure request. <br /> Advanced GeoEnvironmental,Inc. <br />