Laserfiche WebLink
' BORING NO. PB- SB-1 <br /> z ^ COORDINATES N <br /> i <br /> E. <br /> DRILLING REMARKS V FIELD GEOLOGIST S. Aloso DATE BEGAN 9/19/02 <br /> c� a CHECKED BY R Delnagro DATE FINISHED mg/m <br />' a APPROVED BY D Wynne SURFACE ELEV-49 it mal <br /> C3 TOTAL DEPTH 3.5 ft. CORE SIZE 25' dim <br /> LEM ay, a son on, <br />' -FIne3 composition estimated by observation of 9einq rats within a <br /> Ngorously shaken via! of Nater and sample soil <br /> 1 00 <br />' d <br /> i00x <br /> 2 <br />' 3 00 Could not direct-push Pea gravel kept caving In Hydropunch to 18' b'<b.0' <br /> OD9P <br /> TOTAL DEPTH OF BORING 3 5 FEET <br />' 4 <br /> 5 <br /> 6 <br /> 7 <br />' 8 <br /> 9 <br /> -10- <br /> 12 <br /> 012 <br /> -13- <br /> -14- <br /> -15- <br /> 16- <br /> -17- <br /> DRILLER <br /> 3 141518 17DRILLER D Spearson PAGE 1 OF 1 <br /> DRILLING CO Gregg Drilling <br /> DRIWNG METHOD Hand Auger <br /> SAMPLING METHOD , <br /> PROJECT Pacific Bell <br /> LOCATION Tracy, CA <br /> PROJECT NO 838819 06000000 ��• <br /> 0RAVM BY SCHAEFFER ICHECKED BY I E&1,Mr. <br /> NO B388ig-A13 <br /> ShawDATE I 10 17 02 JAPPROVED BY <br />