Laserfiche WebLink
BORING NO_ PB--SB-2 <br /> z z Ar�yy <br /> COORDINATES.N <br /> Z <br /> �i E_ <br /> 9 i DRILLING REMARKS 0 � FIELD GEOLOGIST S-Alo3a DATE BEGAN 9/19/02 <br /> x CHECKED BY R. Deinagro DATE FINISHED 9/19/02 <br /> Ix P,7 I a m APPROVED BY D Wynne SURFACE Elft/ —49 ft ms! <br /> ti TOTAL DEPTHCORE 3.5 tiu 512E 25" dim <br /> ay. S e senon, <br />' 0 0 —Fines composition estimated by observation of esttling rate within a <br /> vigorously shaken vial of water and sample soil <br /> 1 <br />' 00 d <br /> 100>< <br /> 2 <br /> 3 Y Could not direct—push Pee grovel kept caving K Hydropunch to 18' b" <br /> 00 <br /> TOTAL DEPTH OF BORING 3 5 FEET <br /> 4 <br /> g ' <br /> 1 <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> 1i <br /> 12 <br /> 13 <br />' 14- <br /> -15- <br /> 16 16 <br /> i 17 <br /> DRILLER D Spearson PAGE 1 OF 1 <br /> DRILLING CO Gregg Drilling <br /> ORILLING METHOD Hand Auger <br /> SAMPLING METHOD <br /> PROJECT Pacific Bell <br /> LOCATION Tracy, CA L— <br /> PROJECT NO 838819 06000000 <br /> Shaw E&I,Im <br /> DRAWN BY SCHAUM ICHECKED BY I DRAWING NO 835819—A14 <br /> QATE 10 702 APPROVED BY <br />