My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3240
>
2900 - Site Mitigation Program
>
PR0522186
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 2:58:34 PM
Creation date
5/8/2020 2:39:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0522186
PE
2950
FACILITY_ID
FA0015127
FACILITY_NAME
SUMMIT MOUNTAIN SPORTS
STREET_NUMBER
3240
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3240 N TRACY BLVD
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Map <br /> See attached site map for location of site, nearest hospital, and known hazards. <br /> i <br /> Decontamination Procedures <br /> LThe removal of hazardous substances from employees and their equipment will be performed to the <br /> extent necessary to preclude the occurrence of foreseeable adverse health affects. <br /> LPeople <br /> Personnel will employ the use of gloves during sampling. <br /> t _ <br /> Equipment <br /> All equipment used to collect samples will be cleaned before and between each sampling event.The <br /> Project Team Leader will ensure that subcontractors comply with decontamination procedures. <br /> Contingency Plan <br /> Hazardous situations are. not anticipated for this site. However, if hazardous situations are <br /> encountered and escalate to the level of Hazardous Emergencies, the Project Team Leader will <br /> . L continue to assume total control over the site activities. The Project Team Leader will apply pioper <br /> emergency protocols necessary to stabilize the site and minimize harmful effects. <br /> C <br /> ' t <br />
The URL can be used to link to this page
Your browser does not support the video tag.