Laserfiche WebLink
Site Map <br /> See attached site map for location of site, nearest hospital, and known hazards. <br /> i <br /> Decontamination Procedures <br /> LThe removal of hazardous substances from employees and their equipment will be performed to the <br /> extent necessary to preclude the occurrence of foreseeable adverse health affects. <br /> LPeople <br /> Personnel will employ the use of gloves during sampling. <br /> t _ <br /> Equipment <br /> All equipment used to collect samples will be cleaned before and between each sampling event.The <br /> Project Team Leader will ensure that subcontractors comply with decontamination procedures. <br /> Contingency Plan <br /> Hazardous situations are. not anticipated for this site. However, if hazardous situations are <br /> encountered and escalate to the level of Hazardous Emergencies, the Project Team Leader will <br /> . L continue to assume total control over the site activities. The Project Team Leader will apply pioper <br /> emergency protocols necessary to stabilize the site and minimize harmful effects. <br /> C <br /> ' t <br />