My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
13436
>
2900 - Site Mitigation Program
>
PR0528271
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 3:09:28 PM
Creation date
5/8/2020 2:45:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528271
PE
2950
FACILITY_ID
FA0019110
FACILITY_NAME
LIMA RANCH
STREET_NUMBER
13436
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513001
CURRENT_STATUS
01
SITE_LOCATION
13436 N THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• . Pagel of 2 <br /> Mike Infurna [EH] <br /> From: John Cooper ocooper@gercorp.com] <br /> Sent: Tuesday, September 30, 2008 1:42 PM <br /> To: Mike Infurna [EH] <br /> Cc: Fisher, Victor <br /> Subject: RE: Lima Ranch conductor casing schematic <br /> Mike, <br /> We anticipate beginning drilling on October 13. On the 13th we will use direct push to collect reconnaissance <br /> groundwater samples. On October 14th we will advance the auger hole and set the conductor casing, and <br /> continue with the direct push sampling. On October 15th we will continue with the direct push sampling and let the <br /> conductor casing seal set. On October 161h we will advance the exploratory boring through the conductor casing <br /> and collect a deeper reconnaissance groundwater sample. <br /> This assumes that we can advance the auger hole and set the conductor casing in one day. If it takes part of a <br /> second day to set the conductor casing, it will delay advancing the exploratory boring through the conductor <br /> casing until Friday, October 17th. <br /> John <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Tuesday, September 30, 2008 1:21 PM <br /> To: John Cooper <br /> Subject: RE: Lima Ranch conductor casing schematic <br /> thank you. <br /> your anticipated drill date is October 16? <br /> From: John Cooper [mailto:jcooper@gercorp.com] <br /> Sent: Tuesday, September 30, 2008 11:51 AM <br /> To: Mike Infurna [EH] <br /> Cc: Thomas deArth; Fisher, Victor; 'Jeff Hawkins' <br /> Subject: Lima Ranch conductor casing schematic <br /> Mike, <br /> Thank you for taking the time to speak with us yesterday. Attached please find a schematic of the <br /> proposed installation of the conductor casing on the Lima Ranch property. We will place the top of the <br /> conductor casing at least 5 feet below grade. The depths indicated on the schematic are approximate. <br /> The actual depth for setting the conductor casing will depend on the lithology encountered as the borehole <br /> is advanced. Please call me if you have any comments or questions. <br /> Respectfully submitted, <br /> John D. Cooper <br /> 9/30/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.