My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
13436
>
2900 - Site Mitigation Program
>
PR0528271
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 2:59:11 PM
Creation date
5/8/2020 2:46:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528271
PE
2950
FACILITY_ID
FA0019110
FACILITY_NAME
LIMA RANCH
STREET_NUMBER
13436
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513001
CURRENT_STATUS
01
SITE_LOCATION
13436 N THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GuN� <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> 2. Equipment will be thoroughly rinsed with potable water. This <br /> decontamination procedure will be performed before equipment is used and <br /> between each boring location. <br /> 3. Decontamination solutions will be accumulated and containerized in U.S. DOT <br /> 1711-rated drums, or equivalent, for further characterization and disposal. <br /> Sampling Equipment Decontamination <br /> The following procedures will be used to decontaminate sediment sampling equipment: <br /> 1. New disposable gloves will be used for each decontamination procedure to <br /> prevent cross-contamination of equipment. <br /> 2. Equipment will be scrubbed with brushes using a solution of Alconoxr and <br /> potable water. Equipment will be triple rinsed with potable water. <br /> 3. If the sampling device is not going to be used immediately, it will be wrapped <br /> in oil free aluminum foil with the shiny side out. Sampling equipment used to <br /> collect samples for organic analyses will not be allowed to come into direct <br /> contact with plastic. <br /> 4. Sampling equipment that is not readily decontaminated will be discarded after <br /> each use. Discarded decontamination solutions will be accumulated and <br /> containerized in U.S. DOT IA2-rated drums, or equivalent, for further <br /> characterization and disposal. <br /> Groundwater sampling will be performed using new disposable equipment (i.e., bailer, etc.); <br /> therefore, decontamination of groundwater sampling equipment is limited to the rod used to <br /> deliver the bailer to the groundwater interface. The rod will be decontaminated as discussed <br /> above for the sediment sampling equipment. <br /> Field Instrument Decontamination <br /> The following procedure will be used to decontaminate groundwater field parameter testing <br /> equipment and organic vapor analyzers: <br /> 1. Equipment, or portions of equipment,which are water resistant will be <br /> scrubbed with a solution of AlconoxT"and distilled water. Equipment will be <br /> rinsed with potable water followed by a rinse with distilled water. <br /> Lima Ranch 10 of 17 <br /> Site Characterization Work Plan Addendum <br /> April 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.