My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008 - 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 1:11:57 PM
Creation date
5/8/2020 3:44:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) f <br /> Test Method Used: ❑Pressure ❑Vacuum N Hydrostatic <br /> I <br /> ❑Other(Specify) i <br /> Test Equipment Used: Wayne Perry Inc. Equipment Resolution:.0007" I <br /> fi���,��t, {fit '! k� Sy� " v`�}1i 7�'Y „t, ..+�,<v..:�a ,•�i. .tsm. .e: =�=, -;+ •;x,cars' m ;•a,�. m..���� ..=y ,s <br /> II <br /> ,s �} rusZ.. Sump# Sump#a Sump# Sump# <br /> Sump Diameter: <br /> Sump Depth: " I <br /> Sump Material: _ <br /> Height from Tank Top to Top of i <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest — — <br /> EIecti ical Penetration: <br /> Condition of sump prior to testing: If <br /> Portion of Sump Iestedr 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST <br /> PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No N NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ❑NA <br /> product and waterp. I _ <br /> Turbine shutdown response time NA NA NA <br /> Is system programmed for fail-safe ❑Yes ❑No ®NA ❑Yes ❑No N NA ❑Yes ❑No N NA ❑Yes ❑No ❑NA <br /> shutdown?* <br /> Was fail-safe verified to be I <br /> operational?* ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ❑NA <br /> Wait time between applying I <br /> pressure/vacuum/water and starting 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> test: _ <br /> Test Start Time: <br /> Initial Reading(Rr): <br /> Test End Time: <br /> Final Reading(RF): I <br /> Test Duration: 15 Min 15 Min 15 Min 15 Min 15 Min l5 Min_ l5 Min 15 Min <br /> Change in Reading(RF-Rr): <br /> Pass/Fail Threshold or Criteria: -0.0020 0.0020 -0.0020 -0.0020 0.0020 F-o0020 0,0020 0.0020 <br /> I <br /> Test Result: ._ ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑,Fail <br /> Was sensor removed for testing? N Yes❑No ❑NA N Yes ❑No ❑NA N Yes ❑No ❑NA ®Yes❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testin ? N Yes[INo I-]NA N Yes❑No ❑NA ®Yes ❑No ElNA ®Yes ClNo ElNA <br /> Comments—(include in ormation on re airs made priot to testing,and recommended follow-tip fot fiailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.