Laserfiche WebLink
Page of <br /> 5. SECONDARY PIPE TESIING <br /> Test Method Developed By: 0 Piping Manufacturer 0 Industry Standard C]Professional Engineer <br /> (3 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum 0 Hydrostatic <br /> [I Other (Specify) <br /> [Test Equipment Used-. DIAL GAUGE Equipment Resolution:0 to 15"PSI <br /> vga,FAaM%7�". 7, <br /> 7 <br /> Piping Piping Piping Piping <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: <br /> Piping Diarnetez, <br /> Length of Piping Run: Feet Feet Feet Feet <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: Test Boot In Sump Test Boot in Sump lest Boot in Sump <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 minutes 15 Minutes <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RT): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: <br /> Final Reading(RF): PSI PSI PSI PSI <br /> Test Duration: 1 Hour 1 Hour I Hour I Hour <br /> Change in Reading(RF-RI): PSI PSI PSI PSI <br /> Pass/Fail Threshold or <br /> Zero Zero Zero Zero <br /> Criteria: <br /> Test Result: CD Pass El Fail N:Fass ❑Fall �z Pass 0 Fail ❑ Pass ❑Fail <br /> Comments—(include informalion on re us made p)for to testing, and recommended fblloiv-uEfor failed tests) <br />