Laserfiche WebLink
03/10/2001 01:42 FAX Z03 <br /> specific action regarding the concrete UST has occurred because of the TCE aspects of the site. <br /> In October 2001, LNC contacted me and requested that I assist in attempting to close the <br /> petroleum hydrocarbon aspects of the site at 110 East Turner Road. In discussions with you <br /> regarding the site it has become apparent that the PHSEHD file on the site is incomplete <br /> regarding the petroleum hydrocarbon contaminated soil on the remediation stockpile and closure <br /> of the former UST site. It is LNC's wish that the UST portion of the site be closed with regard to <br /> PHSEHD. Prior to submission of a request for closure to PHSEHD a sampling of the stockpiled <br /> soil should be made to determine if the soil is below hazardous levels and determine disposal <br /> options and a final site closure report that will outline closure rationale and all supporting basic <br /> data should be submitted to PHSEHD. A simple proposed workplan to sample the stockpiled <br /> soil is presented below. Depending on the analytical results of the soil sampling a closure report <br /> will be submitted to PHSEHD for the site. <br /> LNC would like to have me do this work as soon as practical. Please contact me at(209) 369- <br /> 9421 if you have any questions. <br /> Sincerely, <br /> Steph n G. Muir <br /> Certified Engineering Geologist#1224 <br /> Expiration Date: 08/30/02 <br /> R\wprllCS\LCNILCN100.wpd 2 <br />