My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
110
>
2900 - Site Mitigation Program
>
PR0009005
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 11:50:28 AM
Creation date
5/11/2020 11:16:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009005
PE
2953
FACILITY_ID
FA0004053
FACILITY_NAME
LUSTRE-CAL NAME PLATE CO
STREET_NUMBER
110
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04124048
CURRENT_STATUS
01
SITE_LOCATION
110 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
canister. <br /> The sample tubing and sampling apparatus shall be purged of at least one purge volume prior to <br /> sample collection. The flow rate during sample purging shall be maintained between 100 and 200 <br /> milliliters per minute, and the flow rate shall be measured and recorded. Photoionization detector <br /> (PID) measurements of the soil vapor will be collected from the boring immediately following the <br /> removal of the first purge volume. PID measurements will continue to be collected until the <br /> concentration of VOCs measured in the purged vapor stabilizes or a maximum of three purge volumes <br /> is reached. <br /> A soil gas sample will be collected using the flow regulator attached to the Summa canister,a process <br /> that should take approximately 6 to 10 minutes. To check for system leaks, a swab containing <br /> isopropyl alcohol will be placed in the vicinity of the borehole seal and the connection between the <br /> plastic tubing from the probe and the Summa canister regulator for approximately one minute during <br /> sample collection. The VOC applied to the swab,2-propanol, is not a constituent associated with the <br /> past LNC site releases and provides a means of leak detection. <br /> Once the soil gas sample has been collected the sampling rod will be withdrawn and the hollow stem <br /> augers will be backed out for five feet to allow the bentonite slurry seal to be punched out of the <br /> augers. Once drilling is resumed soil samples will be collected until the next interval where soil gas <br /> is to be collected is reached. The soil gas sample will then be collected as outlined above. <br /> Soil gas samples shall be transported to the laboratory under chain-of-custody procedures using the <br /> containers supplied by the laboratory or in clean plastic coolers with packing materials. Ice cooling <br /> is not required, and sample holding time is 30 days. <br /> Quality control samples shall include one ambient airsample per day and one duplicate sample. One <br /> trip blank shall be included with each batch of samples sent to the laboratory. Trip blanks are to be <br /> submitted to the laboratory on hold pending the results of the accompanying samples. <br /> Environmental/LNC/Workplan/Appendix 2.wpd 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.