Laserfiche WebLink
If no anomalies are found in the samples accompanying the trip blank, the trip blank shall not be <br /> analyzed. Quality control samples shall be analyzed by US EPA Method TO-15 for the same list of <br /> analytes as soil vapor samples. <br /> 3.6 SVE and Groundwater Well Installations <br /> Shallow Groundwater Monitoring Well <br /> After completing the groundwater monitoring well borehole (LNC-MW 1) at total depths between <br /> 61 feet and 65 feet bgs, approximately 10 feet into the first water bearing zone, the borehole will <br /> be converted into groundwater monitoring wells. The well will be constructed with 2-inch- <br /> diameter Schedule 40 PVC casing with 20 feet of screen at the bottom (10 feet below the water <br /> table and 10 feet above) followed by blank casing to the surface. Filter pack sand(No. 3 is <br /> anticipated)will be emplaced by gravity feed in the annular space from the bottom to a point at <br /> least two feet above the screened interval followed by three-feet of hydrated bentonite chips to seal <br /> the filter pack. Neat cement-bentonite (5 percent bentonite powder) slurry will be used to fill the <br /> annular space to the surface. The wellheads will be equipped with a locking cap and a traffic-rated <br /> steel box set in cement slightly above grade to complete the installation. <br /> Soil Vapor Extraction Wells <br /> Soil vapor extraction wells will consist of shallow wells (<25 feet bgs) and deep wells (up to 60 feet <br /> deep)within the vadose zone. <br /> Shallow Wells (<25 feet bgs) <br /> SVE well casing will consist of 2-inch diameter Schedule 40 PVC with a 0.020-inch slot size screen. <br /> The screen interval is planned to span a vertical distance of approximately 20 feet of the upper zone, <br /> immediately above the "A" Clay. A coarse-sand filter pack will be placed from the bottom of the <br /> screen up to approximately 2 feet above the top of screen interval. A bentonite seal approximately <br /> 2-feet thick will be placed on top of the sand pack,and cement-bentonite grout will seal the remaining <br /> annular space. At the surface, each well will be completed with a 12-inch diameter steel traffic-rated <br /> Environmental/LNC/Workplan/Appendix 2.wpd 6 <br />