box to allow for space to perform connection of the required piping. <br /> Typical well construction diagrams for the shallow SVE wells are presented as Figure 13 <br /> Deep Wells (-60 feet bgs) <br /> SVE well casings will consist of 2-inch diameter Schedule 40 PVC with a 0.020-inch slot size screen. <br /> The screen interval is designed to span a vertical distance of approximately 30 feet of the lower zone, <br /> immediately below the "A" Clay and into the underlying first groundwater bearing zone. This <br /> spanned distance will extend into the first water bearing zone approximately 10 feet (Figure 14). <br /> A coarse-sand filter pack will be placed from the bottom of the screen up to approximately 2-feet <br /> above the top of screen interval. A bentonite seal approximately 2-feet thick will be placed on top of <br /> the sand pack,and cement-bentonite grout will seal the remaining annular space. At the surface,each <br /> well will be completed with a 12-inch diameter steel traffic-rated box to allow for space to perform <br /> connection of the required piping. Typical well construction diagrams for the shallow SVE wells are <br /> presented as Figure 14. <br /> 3.7 Groundwater Monitoring Well Development <br /> Approximately forty-eight(48)hours after installation, the groundwater monitoring well will be <br /> developed to remove fines and settle the filter pack. This will be accomplished using the `surge <br /> blocking and bailing' method and/or pumping using a submersible pump. It is anticipated that at <br /> least ten (10) well casing volumes will be removed from the well during development. <br /> Groundwater quality parameters of pH, temperature, electrical conductivity, dissolved oxygen, and <br /> will be monitored during development and recorded on a well development form. <br /> Environmental/LNC/Workplan/Appendix 2.wpd 7 <br />