My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
110
>
2900 - Site Mitigation Program
>
PR0009005
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 11:50:28 AM
Creation date
5/11/2020 11:16:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009005
PE
2953
FACILITY_ID
FA0004053
FACILITY_NAME
LUSTRE-CAL NAME PLATE CO
STREET_NUMBER
110
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04124048
CURRENT_STATUS
01
SITE_LOCATION
110 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
box to allow for space to perform connection of the required piping. <br /> Typical well construction diagrams for the shallow SVE wells are presented as Figure 13 <br /> Deep Wells (-60 feet bgs) <br /> SVE well casings will consist of 2-inch diameter Schedule 40 PVC with a 0.020-inch slot size screen. <br /> The screen interval is designed to span a vertical distance of approximately 30 feet of the lower zone, <br /> immediately below the "A" Clay and into the underlying first groundwater bearing zone. This <br /> spanned distance will extend into the first water bearing zone approximately 10 feet (Figure 14). <br /> A coarse-sand filter pack will be placed from the bottom of the screen up to approximately 2-feet <br /> above the top of screen interval. A bentonite seal approximately 2-feet thick will be placed on top of <br /> the sand pack,and cement-bentonite grout will seal the remaining annular space. At the surface,each <br /> well will be completed with a 12-inch diameter steel traffic-rated box to allow for space to perform <br /> connection of the required piping. Typical well construction diagrams for the shallow SVE wells are <br /> presented as Figure 14. <br /> 3.7 Groundwater Monitoring Well Development <br /> Approximately forty-eight(48)hours after installation, the groundwater monitoring well will be <br /> developed to remove fines and settle the filter pack. This will be accomplished using the `surge <br /> blocking and bailing' method and/or pumping using a submersible pump. It is anticipated that at <br /> least ten (10) well casing volumes will be removed from the well during development. <br /> Groundwater quality parameters of pH, temperature, electrical conductivity, dissolved oxygen, and <br /> will be monitored during development and recorded on a well development form. <br /> Environmental/LNC/Workplan/Appendix 2.wpd 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.