My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
110
>
2900 - Site Mitigation Program
>
PR0009005
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 11:50:28 AM
Creation date
5/11/2020 11:16:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009005
PE
2953
FACILITY_ID
FA0004053
FACILITY_NAME
LUSTRE-CAL NAME PLATE CO
STREET_NUMBER
110
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04124048
CURRENT_STATUS
01
SITE_LOCATION
110 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix S <br /> Health and Safety Plan <br /> Lustre-Cal Nameplate Corp. <br /> 6.0 AIR MONITORING <br /> The following air monitoring equipment will be used. <br /> X Photoionization Detector(PID) <br /> Flame Ionization Detector(FID) <br /> Draeger Pump and Tubes(specify tubes) <br /> Combustible Gas Meter(CGM) <br /> Oxygen Meter(02) <br /> X Dust(Particle)Meter(if dust is generated) <br /> Other(specify) <br /> The type and frequency of air monitoring for each work task is specified below. Air monitoring <br /> instruments will be calibrated and maintained according to manufacturer's specifications. Calibration <br /> information and air monitoring results will be recorded in project field notes. <br /> TASK INSTRUMENT FREQUENCY <br /> 1. Direct Push Drilling PID Every 15 minutes or as <br /> necessary <br /> 2. Hollow Stem Auger Drilling PID Every 15 minutes or as <br /> necessary <br /> 3. Mud Rotary Drilling PID Every 15 minutes or as <br /> necessary <br /> 4. Cone Penetrometer Testing PID Every 15 minutes or as <br /> (CPT) necessary <br /> 5. Groundwater Sampling <br /> (other than during drilling) <br /> 6. Soil Sampling (other than <br /> during drilling) <br /> 7. Excavation PID Every 15 minutes or as <br /> necessary, CGM when <br /> elevated concentrations are <br /> detected on the PID,Prior to <br /> proper entry to excavation <br /> Page 16 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.