Laserfiche WebLink
■VZ1 kNC <br /> TABLE OF CONTENTS <br /> Page <br /> I Introduction 1 <br /> 11 Proposed Revised Remedial Action Plan 2 <br /> III Remedial Action Tasks Description 4 <br /> Task 1-Site Preparation 4 <br /> Task 2-Soil Excavation, Sampling and Stockpiling 4 <br /> Task 3-Soil Aeration and Landfarming Operation 6 <br /> Task 4-Final Closure Report 6 <br /> IV Projected Project Schedule 6 <br /> V References 8 <br /> EXHIBITS <br /> . Exhibit 1 Site Location Map <br /> Exhibit 2 Site Activity Map <br /> Exhibit 3 Boring Locations Near Concrete Tank <br /> Exhibit 4 Composite Geologic Section <br /> Exhibit 5 Cross-Section A-A' Through Concrete Tank <br /> Exhibit 6 Cross-Section B-B' Through Concrete Tank <br /> Exhibit 7 Cross-Section C-C' Through Concrete Tank <br /> Exhibit 8 Map Depicting Estimated Lateral Extent of Hydrocarbon and Solvent <br /> Impacted Soil <br /> APPENDICES <br /> Appendix I Analytical Results from The Mark Group, 1992, Investigation <br /> Appendix II Analytical Laboratory Results <br /> Appendix III Soil Boring Logs <br /> Appendix IV Health and Safety Plan <br /> S Appendix V Soil Sampling Plan <br />