My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TULLY
>
17725
>
2900 - Site Mitigation Program
>
PR0526486
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:22:25 PM
Creation date
5/11/2020 11:39:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526486
PE
2965
FACILITY_ID
FA0017927
FACILITY_NAME
LOCKEFORD COMMUNITY SVCS DIST
STREET_NUMBER
17725
Direction
N
STREET_NAME
TULLY
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237
APN
05303039
CURRENT_STATUS
01
SITE_LOCATION
17725 N TULLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 <br /> Surveying and Sampling <br /> 3.1 SURVEYING <br /> Once installed,the monitoring wells will be surveyed by KSN Inc., a qualified licensed land <br /> surveyor. These wells will be located with regards to both the California State Plane and <br /> Geographic Coordinate Systems, relative the North American Datum, 1983 (NAD83) and <br /> matching existing wells at the WWTF. The elevation of the north quadrant of each PVC well <br /> easing will be surveyed to within 1/1001h of a foot accuracy,relative to the National Geodetic <br /> Vertical Datum 1929 (NGVD29) and reported as feet above mean sea level (again consistent <br /> with the datum used for surveying the existing WWTF wells). Adjacent ground surface will also <br /> be surveyed for reference. <br /> Care shall be exercised during surveying to avoid introduction of foreign material into the well. <br /> Rod or receiver bottoms shall be wiped with a chlorine solution prior to setting on well casing <br /> for each well. <br /> 3.2 SOIL SAMPLING <br /> No soil samples will be collected at the site of ier than those used to classify the geologic <br /> materials penetrated by the boreholes. <br /> Spoils from drilling will be dispersed to land. <br /> 3.3 WELL WATER SAMPLING <br /> 3.3.1 WATER LEVEL MEASUREMENTS <br /> Depth to water measurement will be complete d and recorded,for all wells,prior to purging and <br /> sampling. Water-level measurements will be taken with an electronic tape (sounder)and the <br /> same sounder will be used at all monitoring1 cations, assuring reproducibility of the results. <br /> Water levels will be recorded to the nearest 0. 1 foot and will be referenced to the surveyed <br /> datum (north quadrant of the PVC well casing, and or notch carved into the PVC casing). Depth <br /> to groundwater measurements will then be co verted to groundwater elevations and used to <br /> develop a groundwater elevation contour map, in order to identify groundwater flow direction <br /> and gradient. <br /> 3.3.2 PURGING <br /> A minimum of three well volumes will be purged from the wells prior to sampling. Purging will <br /> be accomplished by pumping with a portable pump or by manually bailing. Field water quality <br /> parameters(temperature,pH, and electrical conductivity)will be collected at the beginning of <br /> purging and after each well volume has been removed. <br /> March 2006 1Lockeford CSD <br /> 3-1 Groundwater Monitoring Well Installation Workplan <br />
The URL can be used to link to this page
Your browser does not support the video tag.