My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TULLY
>
17725
>
2900 - Site Mitigation Program
>
PR0526486
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 4:22:25 PM
Creation date
5/11/2020 11:39:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526486
PE
2965
FACILITY_ID
FA0017927
FACILITY_NAME
LOCKEFORD COMMUNITY SVCS DIST
STREET_NUMBER
17725
Direction
N
STREET_NAME
TULLY
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237
APN
05303039
CURRENT_STATUS
01
SITE_LOCATION
17725 N TULLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
loading which may exist or which ma <br /> construction of the project. y arise during the <br /> 3• The contract Price <br /> all costs relatinhown in the proposal shall include <br /> excavations. g to trench safety and shoring a to <br /> in the support systems directed by <br /> 1 the Engineer to insure compliance with the Safety <br /> Orders, or changes required to accommodate con <br /> encountered in the field conditions <br /> work and no extra will not be considered extra <br /> Payment will be forthcoming as a <br /> result of the changes required. <br /> B. Dewatering, Drainage and Flotation <br /> t 1. The contractor shall, at all times during construction <br /> Provide and maintain <br /> remove Proper equipment and facilities to <br /> promptly and properly dispose of all water <br /> entering excavations and keep such excavations d <br /> to obtain a satisfactory undisturbed subgrade foundation <br /> condition until the fill , structure , or Pipes to be <br /> dry so as <br /> built thereon have been completed to such extent that <br /> they will not be floated or ot <br /> • allowing water levels to return tonaturalee d vi <br /> atgo d. by <br /> s. <br /> PART 2 : PRODUCTS <br /> 2. 01 GENERAL <br /> A. Materials shall be furnished as required from on-si <br /> sources or hauled to the site from off site sources. te <br /> B. Disposal of unsuitable material is s <br /> Section. See Paragraph 3. 09. Pecified in this <br /> 2. 02 ENGINEERED FILL <br /> Engineered fill shall be used for embankment , structural <br /> backfill and trench backfill . Material shall consist of <br /> soils excavated from on-site sources and substantially free <br /> Of organic material, wood , trash , and other objectionable <br /> material which may be compressible or which cannot b <br /> compacted properly . The material to be used must be <br /> acceptable to the En e <br /> contain stones, broken Engineer . <br /> masoEngineered fill shall not <br /> rle <br /> similar materials larger than 10 inchesn in, <br /> anyubd m sor other <br /> ion. It <br /> shall have physical properties such that it can be readily <br /> spread and compacted during filling. <br /> Materials falling within the <br /> encountered Burin above Specification , <br /> on , may be s <br /> segregated stockpiles for reuse. All excavatlmaterial which Dred in <br /> . in the <br /> EARTHWORK <br /> 02200-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.