Laserfiche WebLink
�� • R <br /> j 3. 11 CLEANUP <br /> After completing all earthwork <br /> the site in a neat and clean �conditi n, doing s cthe Cntractor h1 leave <br /> g <br /> ' as is required by the as <br /> plans , or if not called for on the <br /> plans to restore the site to its original shape and <br /> configuration . Any existing features , improvements , and <br /> 3 other facilities damaged or affected by the work shall be <br /> replaced, repaired, or restored to their original condition <br /> or better . <br /> 3. 12 SOILS DATA <br /> No test holes have been made at the <br /> Project <br /> test holes were previously made at the existingsewagetreatment plant site . A report and soils log from those <br /> borings is available upon request from the Engineer . Both <br /> the soils log and report are for information purposes only <br /> and are not a guarantee of the conditions to be encountered <br /> by the Contractor . <br /> END OF SECTION <br /> EARTHWORK <br /> 02200-10 <br />