Laserfiche WebLink
CLIENT: bp <br /> 'V"'EEDER <br /> ROOT CARSON CANISTER VAPOR POLISHER \\� <br /> LIANCECOMP AND INSTALLATION NOTES GLOBAL FUELS TECHNOLOGY <br /> 150 WARRENVILLE ROAD <br /> NAPERVIE.LE, iLL9a01S 60563-8473 <br /> THESE NOTES ARE APPLICABLE TO NEW AND RETROFIT INSTALLATIONS <br /> NATIONAL SITE ADAPT CONSULTANT: <br /> LOCATION OF VAPOR PROCESSING EQUIPMENT CA FIRE CODE: ADDITIONAL INSTALLATION NOTES: ADDITIONAL INSTALLATION NOTES AT DISPENSERS: <br /> CFC 2007 §2206.7.9.2.2 LOCATION 1. ALL INSTALLATIONS OF VEEDER ROOT CARBON CANISTER VAPOR POLISHER 1. SOME DISPENSER NOZZLES HOLSTERS ARE NOT COMPATIBLE WITH THE <br /> INSTALLATIONS SHALL BE REVIEWED BY BP LOGISTICS FOR APPROVAL CURRENT VST DESIGN. CONSULT WITH BP PROJECT MANAGER FOR A LIST <br /> EQUIPMENT VAPOR-PROCESSING EQUIPMENT SHALL BE LOCATED AT OR ABOVE PRIOR TO SUBMITTALS TO AUTHORITIES HAVING JURISDICTION AND OF DISPENSERS THAT ARE NOT COMPATIBLE WITH THE DESIGN AND DO NOT <br /> GRADE. SOURCES OF IGNITION SHALL BE LOCATED NOT LESS THAN 50 FEET RE-REVIEWED BY BP LOGISTICS AFTER PERMIT APPROVALS ARE OBTAINED. INSTALL VST AT LOCATIONS WHERE THESE DISPENSERS EXIST. <br /> EADDITIONALLY INDIVIDUAL SITE PLANS NEED TO BE REVIEWED BY THE ECS Rni <br /> (15240MM) FROM FUEL-TRANSFER AREAS AND NOT LESS THAN 18 INCHES TO MAKE SURE THERE ARE NO SENSITIVE RECEPTORS WITHIN 1000 FEET 2. THE PRESSURE SENSOR LOCATED IN THE DISPENSER SUMP CLOSEST TO <br /> (457.2MM) ABOVE TANK FILL OPENINGS AND TOPS OF DISPENSER ISLANDS. OF THE EQUIPMENT LOCATION. THE TANK FARM SHALL BE PREFERABLY MOUNTED OUTSIDE THE DISPENSER Gott/®/ - Ryon Inc. <br /> VAPOR-PROCESSING UNITS SHALL BE LOCATED NOT LESS THAN 10 FEET 2. ON EXISTING FACILITIES CONTRACTOR TO PERFORM LIQUID AND VAPOR CONTAINMENT SUMP OR ABOVE THE HIGHEST PENETRATION FITTING. DURING <br /> VENT LINES PRIOR TO PROCEEDING WITH INSTALLATION CONTAINMENT SUMP CERTIFICATION TESTING CONTRACTOR TO REMOVE THE 6747 SIERRA CT. SUITE J <br /> (3048MM) FROM THE NEAREST BUILDING OR PROPERTY LINE OF A PROPERTY TIGHTNESS TEST ON E PRESSURE SWITCH TO AVOID POSSIBLE WATER DAMAGE. DUBLIN, CA. 94555 <br /> WHICH CAN BE BUILT UPON. OF THE VEEDER ROOT SYSTEM, REPORT TO BP PRODUCT MANAGER WITH (925) 551-7555 <br /> EXCEPTION: WHERE THE REQUIRED DISTANCES TO BUILDINGS, PROPERTY RESULTS. 3. THE PRESSURE SENSOR MUST BE INSTALLED IN THE VERTICAL POSITION, <br /> I LINES OR FUEL-TRANSFER AREAS CANNOT BE OBTAINED, MEANS SHALL BE SENSING PORT POINTING DOWN, AND WHEN REQUIRED BY AUTHORITY HAVING <br /> PROVIDED TO PROTECT EQUIPMENT AGAINST FIRE EXPOSURE. ACCEPTABLE 3. THE VENT DISCHARGE SHALL BE LOCATED AND DIRECTED SO THAT VAPORS JURISDICTION, THE CONNECTION TO THE VAPOR LINE MUST BE BELOW THE MASTER DRAWING RELEASE HISTORY <br /> I WILL DISPERSE. VAPORS SHALL BE DIRECTED UPWARD AND HORIZONTALLY VERSION DATE <br /> MEANS INCLUDE: SHEAR VALVE <br /> s 1. APPROVED PROTECTIVE ENCLOSURES, WHICH EXTEND AT LEASE 18 AWAY FROM ADJACENT WALLS. VENT OUTLETS SHALL BE LOCATED SO AS <br /> INCHES (457.2MM) ABOVE THE EQUIPMENT, CONSTRUCTED OF FIRE-RESISTANT NOT TO BE TRAPPED BY EAVES OR OTHER OBSTRUCTIONS AND SHALL BE 4. THE 3-WAY VALVE TEST PORT ON THE PRESSURE SENSOR IN THE <br /> R NON-COMBUSTIBLE MATERIALS OR AT LEAST 5 FEET FROM BUILDING OPENINGS. DISCHARGE SHALL NOT BE Coxx V-1 MAY 2000 <br /> OR DISPENSER CLOSEST TO THE TANK FARM SHALL BE "CAR SEALED" WITH Coxx v-1 FEB 2001 <br /> 2. FIRE PROTECTION USING AN APPROVED WATER-SPRAY SYSTEM. LESS THAN 12' FROM FINISH GRADE. VENTS SHALL BE INSTALLED IN LABELS INDICATING CORRECT OPERATING POSITION. VALVE TO REMAINCoxx v-2 JUNE 2001 x <br /> ACCORDANCE WITH NFPA 30 (2008). CLOSED FOR NORMAL OPERATION TO AVOID FALSE PRESSURE READING BY <br /> Coxx v-3 JAN 2002 <br /> VAPOR--PRtJCESSING EQUIPMENT SHALL BE LOCATED A MINIMUM OF 20 FEET THE ISD SOFTWARE. <br /> VG EQUIPMENT SHALL BE 4. VENT RISERS SHOULD STAND NO LESS THAN 3' FROM THE OUTSIDE OF Coxx v-4 JUNE 2002 <br /> (6096MM) =RON DISPENSING DEVICES. PROCESSING v <br /> I <br /> PROTECTED AGAINST PHYSICAL DAMAGE BY GUARDRAILS, CURBS, PROTECTIVE CURB. 5. THE DISPENSERS MUST BE A BALANCE TYPE DISPENSER. Coxx v-5 FEB 2003 <br /> ENCLOSURES OR FENCING. WHEN APPROVED PROTECTIVE ENCLOSURES ARE <br /> USED, APPROVED MEANS SHALL BE PROVIDED TO 5. THE CONTRACTOR IS RESPONSIBLE FOR SHORING AND THE PROTECTION IN coxa v-6 JULY 2004 <br /> VENTILATE THE VOLUME <br /> I 6. THE DISPENSERS MUST BE CARB APPROVED UNIHOSE TYPES UNLESS L0 <br /> WITHIN THE ENCLOSURE TO PREVENT POCKETING OF FLAMMABLE VAPORS. PLACE OF EXISTING FACILITIES. PERMITTED BY AUTHORITY HAVING JURISDICTION. Coxx V-7 MARCH 2006 <br /> io <br /> COXX V-8 JULY 2007 <br /> IF A DOWNSLOPE EXISTS TOWARD THE LOCATION OF THE VAPOR-PROCESSING 6. MAINTAIN 5 FEET CLEAR AROUND CARBON CANISTER VAPOR POLISHER 7. THERE SHALL BE NO FLOW LIMITERS ALLOWED FOR THE VST SYSTEM. <br /> Coxx V-8.1 DEC 2008 0 <br /> o <br /> UNIT FROM A FUEL-TRANSFER AREA, THE CHIEF IS AUTHORIZED TO REQUIRE FOOTPRINT TO GRADE. <br /> ADDITIONAL SEPARATION BY DISTANCE AND HEIGHT. v <br /> 8. FOLLOW PEI RP-400 FOR ELECTRICAL CONTINUITY OF HANGING HARDWARE coxx v-9.a JAN 2010 °' <br /> 7. BALL FLOAT VALVES ARE CURRENTLY INSTALLED AS BP STANDARD <br /> CFC 2007 §2206.7.9.2.3 INSTALLATION PRACTICE FOR PROTECTION OF WETTING OF THE VENT AND STAGE II VAPOR 9. THE VST HANGING HARDWARE HAS THE OPTION OF LONGER HOSE LENGTHS. <br /> VAPOR--PROCESSING UNITS SHALL BE SECURELY MOUNTED ON CONCRETE, PIPING. CONTRACTOR TO CONFIRM THE EXISTING INSTALLATION AND MAXIMUM HOSE LENGTH WHEN CONNECTED IS LIMITED TO 15'-0" CONSULT NO. DATE REVISION DESCRIPTION <br /> MASONRY OR STRUCTURAL STEEL SUPPORTS ON CONCRETE OR OTHER REPLACE ALL BALL FLOAT VALVES AT EXISTING FACILITIES. WITH DISPENSER MANUFACTURER FOR EXTENDED HOSE REACH DESIGN0) <br /> 1 0, <br /> NON-COMBUSTIBLE FOUNDATIONS. OPTION. 12 <br /> 8. CONTRACTOR SHALL CONFIRM AND LABEL ALL VENT STACKS WITH CORRECT <br /> 2 N <br /> NOTE: BP DOES NOT PERMIT THE VAPOR-PROCESSING EQUIPMENT TO BE PRODUCT VENT TIE IN TO AVOID PRODUCT CONTAMINATION AND IMPROPER <br /> INSTALLED ON ROOFS OF BUILDINGS OR CANOPY STRUCTURES. SEE ALTERNATE PROCESSOR TIE-IN. PROVIDE CONFIRMATION ON PIPE AND TANK CHECKLIST TESTING NOTES: o <br /> MOUNTING DETAILS FOR EXISTING SITES WHERE VENT RISERS AR MOUNTED AT (LABEL MAKER OK). "DO NO INSTALL ON DIESEL" o <br /> ROOFS PER CARB E.O. VR-204 ALL EXISTING SINGLE WALL VENT AND VAPOR PIPING I � <br /> 9. THERE SHALL BE NO POCKETS OR LIQUID TRAPS IN ANY OF THE INSTALLATIONS AND NEW DOUBLE WALL VENT AND VAPOR INSTALLATIONS SHALL N <br /> EXISTING CDITIONS: CONNECTED PIPING FROM THE VEEDER ROOT CARBON CANISTER VAPOR <br /> (� HAVE THE FOLLOWING TESTS TO BE COMPLETED WITHIN 60 DAYS AFTER 0 <br /> r START-UP AND AT LEAST ONCE IN EACH 12 MONTH PERIOD USING THE s o <br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXISTING POLISHER TO THE VENT STACK TIE-IN POINT. <br /> CONTROLLING SITE CONDITIONS AND FOR COMPLIANCE WITH LOCAL ORDINANCES FOLLOWING TEST PROCEDURES. E <br /> � <br /> I` AND CURRENT CALIFORNIA BUILDING CODES. <br /> 10. THE VENT STACK RACK AND RISERS SHALL BE GROUNDED. TIE THE <br /> GROUND WIRE FROM THE VENT STACKS TO THE UST SYSTEM GROUND. TP-201.3 DETERMINATION OF 2-INCH WC STATIC PRESSURE41 <br /> v <br /> APPLICABLE CODES: PERFORMANCE OF VAPOR RECOVERY SYSTEMS OF DISPENSING FACILITIES B 0 <br /> ALL WORK SHALL BE IN STRICT ACCORDANCE WITH THE LATEST EDITION OF 11. PRIOR TO PERFORMING MAINTENANCE, TEST PORT VALVE MUST BE VENTED (March 17, 1999); 9 <br /> THE CALIFORNIA BUILDING CODE AND REFERENCED STANDARDS. TO ATMOSPHERE. <br /> (' TP-201.4 DYNAMIC BACK PRESSURE (July 3, 2002) IN ACCORDANCE <br /> A u <br /> PLANS AND PERMITS: 12. VEEDER ROOT SYSTEM TO BE LEAK-TESTED PRIOR TO START-UP TO AVOID WITH THE CONDITION LISTED IN ITEM 1 OF THE VAPOR COLLECTION _ <br /> THE CONTRACTOR SHALL OBTAIN ALL NECESSARY ENCROACHMENT PERMITS AND LEAKAGE TO ATMOSPHERE. SECTION OF EXHIBIT 2 OF THE VR-204 EXECUTIVE ORDER; IN ADDITION - <br /> SHALL POSSESS APPROVED PLANS PRIOR TO BEGINNING OF CONSTRUCTION. BP PROCEDURES REQUIRE THE EXECUTION OF METHODOLOGY 6 z 0 <br /> z <br /> 13. ANY SPENT CARBON FROM CANISTER SHALL BE TREATED AS HAZARDOUS v <br /> UTILITY LOCATIONS: WASTE AND DISPOSED OF PROPERLY EXHIBIT 4 OF THE VR-204 EXECUTIVE ORDER, REQUIRED ITEMS IN <br /> THE CONTRACTOR WILL BE REQUIRED TO NOTIFY MEMBERS OF UNDERGROUND CONDUCTING TP-201.3 <br /> SERVICE ALTER U.S.A. 48 HOURS IN ADVANCE OF PERFORMING EXCAVATION �� � Y M. c <br /> ( ) 14. INSPECT FOR VEEDER ROOT CARBON CANISTER VAPOR POLISHER FOR <br /> WORK BY CALLING THE TOLL-FREE NUMBER (800)-227-2600. EXCAVATION DAMAGE PRIOR TO START UP OR RE-COMMISIONING AFTER SERVICE. EXHIBIT 5 OF THE VR-204 EXECUTIVE ORDER, LIQUID REMOVAL TEST - <br /> FOR THE PURPOSE OF THIS REQUIREMENT, IS DEFINED <br /> AS BEING 18" OR PROCEDURE; � � l � �� <br /> MORE IN DEPTH BELOW THE EXISTING SURFACE. ELECTRICAL INSTALLATION NOTES: 933 > <br /> EXHIBIT 6 OF THE VR-204 EXECUTIVE ORDER, HYDROCARBON SENSOR XP 03f31111 <br /> 1. ALL ELECTRICAL INSTALLATIONS ARE TO BE PER NEC/CEC CODE FOR THE VERIFICATION TEST; <br /> Q41 <br /> � 00 <br /> AREA INSTALLED. INSTALLATION IN A CLASSIFIED AREA IS AN EXCEPTION EXHIBIT 8 OF THE VR-204 EXECUTIVE ORDER, VAPOR F®P CA1-\�O L <br /> TO THE NORMAL SITING AND SHALL REQUIRE FURTHER REVIEW OF BP0 <br /> PRESSURE SENSOR VERIFICATION TEST; v <br /> PROJECT MANAGER. <br /> a� <br /> CANISTER VAPOR POLISHER IS EXHIBIT 9 OF THE VR-204 EXECUTIVE ORDER, DETERMINATION OF VST CONFInENTIAUIX STATEMENT_ > <br /> 2. ENSURE THE VEEDER ROOT CARBON CANT PROCESSOR ACTIVATION PRESSURE; <br /> BONDED AND GROUNDED TO THE SITE SYSTEM AND TO THE SITE TANK THE RECIPIENT of THESE MATERIALS UNDERSTANDS THAT <br /> COPYRIGHT IN THE MATERIALS IS OWNED BY BP, AND ALSO, I <br /> THAT THE MATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL <br /> GROUNDING SYSTEM TO ELIMINATE THE POSSIBILITY OF ELECTRICAL AND EXHIBIT 11 OF THE VR-204 EXECUTIVE ORDER, OPERABILITY TEST BUSINESS INFORMATION of IN ACCORDINGLY.THE <br /> RECIPIENT AGREES TO RETAIN THESE MATERIALS Rd STRICT <br /> CONFIDENCE AND AGREES NOT TO DISCLOSE THESE (O <br /> DISCHARGE AS AN IGNITION SOURCE. PROCEDURE FOR THE VEEDER-ROOT ISD FLOW METER. <br /> MATERIALS TO ANY OTHER PARTY AND FURTHER AGREES <br /> NOT TO MAKE COPIES OF THE MATERIALS. THE RECIPIENT o <br /> AGREES TO USE THE MATERIALS ONLY FOR THE LIMITED 6 <br /> 4 3. BONDING AND GROUNDING: BONDING AND GROUNDING GUIDELINES FOR <br /> SHORTER TIME PERIODS MAY BE SPECIFIED IN ACCORDANCE WITH LOCAL PURPOSE FOR WHICH BP HAS MADE THE MATERIALS <br /> DISPENSING EQUIPMENT ARE TO BE IN PLACE MATERIBLE, AND RECIPIENT AGREES TO RETURN Ail <br /> f. CONSTRUCTION REGARDING Q <br /> DISTRICT REQUIREMENTS. NOTIFICATION OF TESTING, AND SUBMITTAL OF TEST MATERIALS To BP EITHER UPON COMPLETION F <br /> INTENDED PURPOSE OR UPON THE REQUEST OF BP. � <br /> WHK:HEVEP.COMES FIRST. >_ <br /> G AND IN ACCORDANCE WITH PETROLEUM EQUIPMENT INSTITUTE (PEI). RESULTS, SHALL BE DONE IN ACCORDANCE WITH LOCAL DISTRICT PIPE AND TANK DEIGN a AIMER U <br /> I <br /> REQUIREMENTS AND PURSUANT TO POLICIES ESTABLISHED BY THAT DISTRICT. <br /> ALTERNATIVE TEST PROCEDURES, INCLUDING MOST RECENT VERSIONS OF THE BP DOES NOT AIS CANNOT WARRANT THAT THE PLANS FOR <br /> PETROLEUM STORAGE AND DISPENSING ARE COMPLIANT WITH O) <br /> ALL LEGAL REQUIREMENTS THAT EXIST OR AS THEY MAY BE Da <br /> I <br /> TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY THE ARB <br /> APPLIED IN THE FUTURE. NOR DUES BP WARRANT <br /> f EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING, TO YIELD <br /> CONFORMITY <br /> STORAGE AND DELIVERY SYSTEM REE O ALL IN 0 <br /> I CONFORMITY WITH THESE PLANS WILL BE FREE OF ALL <br /> EQUIVALENT RESULTS. IT IS FURTHER ORDERED THAT THE FOLLOWING LEAKS YOU ARE ACCORDINGLY STRONGLY ENCOURAGED TO 0 <br /> CONSULT WITH A AFUELINGCCORD STATION STRONGLY <br /> O YOUR � <br /> TO <br /> NTLY <br /> HETHER <br /> REQUIREMENTS ARE MADE A CONDITION OF CERTIFICATION. THE OWNER OR STORAGE <br /> AND <br /> DELIVERY SYSTEM <br /> EVALUATE STATION.THESE <br /> PLANS ARE TRULY SUFFICIENT FOR CONSTRUCTING THE <br /> STORAGE PNO DELIVERY SYSTEM AT YOUR STA110N. +. <br /> OPERATOR OF THE VST PHASE II EVR SYSTEM INCLUDING VEEDER-ROOT ISD <br /> SHALL CONDUCT, AND PASS, THE FOLLOWING TESTS NO LATER THAN 60 DAYS DEVELaPMEr1T INFORMATION. E <br /> AFTER STARTUP USING THE FOLLOWING TEST PROCEDURE: EXHIBIT 10, NOZZLE <br /> UNDERGROUND STORAGE <br /> BAG TEST PROCEDURE. NOTIFICATION OF TESTING, AND SUBMITTAL OF TEST <br /> RESULTS, SHALL BE DONE IN ACCORDANCE WITH LOCAL DISTRICT TANK STANDARDS 0 <br /> REQUIREMENTS AND PURSUANT TO THE POLICIES ESTABLISHED BY THATL <br /> DISTRICT. ALTERNATIVE TEST PROCEDURES, INCLUDING MOST RECENT VERSIONS E�EI�IEI\I•T TP®1 I„ <br /> OF THE TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY V-9.0 2010 SERIES <br /> THE ARB EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING, GENERAL SHEETS DESIGN INTENT N <br /> 0 <br /> TO YIELD EQUIVALENT <br /> 0 <br /> RESULTS. <br /> SITE ADDRESS: � <br /> 0 <br /> i <br /> 1 0 <br /> s <br /> r o <br /> 1000 <br /> c0 <br /> w <br /> Q <br /> 1 DESIGNED BY: Ln <br /> SHK/O AWANCE Z&DM: Dg <br /> w <br /> IY; <br /> q <br /> CNEOKD R SHK10V BP REPM' Dg o <br /> J <br /> DRAWN BY: AWANCE PM: ®® w <br /> VERSION: V'9.0 PROJECT No00 <br /> E <br /> 01/04/2010 0 <br /> L <br /> DRAWING TITLE: <br /> DESIGN INTENT:VEEDER-ROOT <br /> / <br /> CARSON CANISTER VAPOR POLISHER o <br /> COMPLIANCE(CALIFORNIA NOTE <br /> ONLY) � <br /> k m <br /> / <br /> SHEET NO: c <br /> v <br /> U <br /> In <br /> Adlik <br /> U <br /> t N <br /> 0 <br /> ® ® ILI <br /> k <br /> J <br /> { LL. <br /> I <br /> i <br /> I <br />