Laserfiche WebLink
CLIENT. <br /> Oak <br /> bwlu <br /> VEEDER- ROOT CARBON CANISTER VAPOR POLISHER TYPICAL DOUBLE WALL SCALE: 1 <br /> VENT STACK DETAILS WITH " = 1'-0" -` <br /> 01 <br /> 10 1/2" 10 1/2" 10 1/2' 10 1/2- 10 1/2- 10 1/2' <br /> JI PRESSURE VACUUM VENT PRESSURE VACUUM VENT <br /> 23 CAPS (SEE NOTE BELOW) <br /> CAPS (SEE NOTE BELOW) <br /> GROUP PRESSURE VACUUM VENT CAP <br /> SERVICEABLE VAPOR SENSOR ROUP <br /> 23CABLE FROM KIT <br /> (SEE NOTE BELOW) ATTACHES <br /> 2 PIN CONNECTOR OF � . ....__.. ..._.. <br /> TO CCVP VALVE <br /> 8 18 2 "GALVANIZED UN ONG&LNIPPLES 8 8 <br /> UNION & NIPPLES CANISTER SUPPORT BRACKET GLOBAL FUELS TECHNOLOGY <br /> —� AND FASTENERS (FROM KIT) <br /> 6 <br /> 150 WARRENVILLE ROAD <br /> O ( NAPERVILLE, ILLINOIS 60563-8473 <br /> VEEDER-ROOT CARBON CANISTER CANISTER SUPPORT STUDS <br /> O O ( VAPOR POLISHER 67 W/ NUTS (3 EAH SIDE) NATIONAL SITE ADAPT CONSULTANT: <br /> 1 O I CANISTER WEIGHT APPROX. 70 LBS. VEEDER-ROOT CARBON CANISTER <br /> SEE FOUNDATION DESIGN CRITERIA I I I I I VAPOR POLISHER <br /> I BELOW I I CANISTER WEIGHT APPROX. 70 LBS. <br /> INSTALL ONLY ON THE 87-OCTANE 67 SEE FOUNDATION DESIGN CRITERIA <br /> 3 CANISTER SUPPORT BRACKET VENT RISER. DO NOT INSTALL ON BELOW <br /> AND FASTENERS (FROM KIT) DIESEL RISER IF EXISTING 4TH VENT-/ INSTALL ONLY ON THE ST OCTANE <br /> 4TH VENTVENT RISER. DO NOT INSTALL ON <br /> (IF REQUIRED) (IF REQUIRED) DIESEL RISER IF EXISTING <br /> o CANISTER SUPPORT STUDS W/ <br /> EXPLOSION PROOF J-BOX Tett/®r - Ryon /no. � <br /> NUTS (3 EACH SIDE) MOUNTED TO POST 89 CORD GRIP (FROM KIT) <br /> I 71 cr_ 6747 SIERRA CT. SUITE J I <br /> DUBLIN, CA. 94568 <br /> O 2 U-BOLTS w J — (925) 551-7555 <br /> " I I I o0 I I X <br /> ® _ I I I I I I >Q I I -T <br /> I I MASTER DRAWING RELEASE HISTORY <br /> 2 I I I , j � � <br /> MANUFACTURER SUPPLIED 111 <br /> 2" VENT PIPE EXTENSION MOUNTING TUBING I I I- o I I 1 0- <br /> CJ Z VERSION DATE _ <br /> I w z N 1 89 EXPLOSION PROOF J-BOX v <br /> 1 z GROUP I I I I 3 w w m I I MOUNTED TO POST coxx v-0 MAY 2000 <br /> INSTALLING CANISTER ONTO BRACKET I I I 1 I I I a -o �' �' I I I I MANUFACTURER SUPPLIED coxx v-1 FEB 2001 0 <br /> 11 II <br /> w Ld o I 11 <br /> I I I I I-m Q z ow Z w z I I 1 1 MOUNTING TUBING COXX V-2 JUNE 2001 0 <br /> �� F- m U, 0 I I <br /> I I I N _ > Q a w COXX V-3 JAN 2002 1- <br /> o o- a I I <br /> l I 1 I I I Lij z z w°? cam.) F-- z L) I I COXX V-4 JUNE 2002 0 <br /> 2" REDUCING TEE I I _ <br /> I I ^ v'0 w ' w > � <br /> 2" SCH. 40 GALV. STEEL 8 I I I I COxX V-5 FEB 2003 0 <br /> CANISTER OPERABILITY TEST PORT I I VENT RISER PAINT TO D I I ¢ o b Z ' - o of = w a <br /> U <br /> *MAINTAIN CLEARANCE INA MATCH SITE CONDITIONS >� c"I V z N w coxx v-6 JULY 2004 <br /> t- ¢ coxx V-7 MARCH 2006 <br /> DIRECT LINE, TO ALLOW FOR o °` w z z <br /> CONNECTION OF TESTING = w I <br /> APPARATUS. I = of w a- w ' ' 8 2" SCH. 40 GALV, STEEL coxx v-8 JULY 2007 0 <br /> o =o ¢ ' VENT RISE PAINT TO � <br /> =w w w w U) I I I COXX V-i3.1 DEC 2006 M <br /> i-/ I I N FASTEN VENT RISER TO FRAME W/ w J z I I I ° MAT.�H S"TE :C�'�CITIOMS N <br /> 3-WAY LOCKING BALL VALVE I 1 1 » » I I I a w X o i 1 4 COXti V-9.0 JAN 2010 <br /> cn 2 BRONZE U-BOLT, 3/8 HOLE 1 I N = o J I I i €°_`s FASTEN °JEN T R;SEI? TO FRAME ' `% o <br /> TO BE LOCKED IN OPEN I / 1 I o W/ LOCK WASHER HEX NUT. TEST I I x zo >_w N w <br /> POSITION IN NORMAL OPERATING I t= EACH RISER FOR ELECTRICAL Q z = z zo Ili!; � 2" BRONZE ;.I--BOLT, 3/8"0 HOLE <br /> o <br /> ,� <br /> MODE. I �I I Q CONTINUITY TO VENT RACK TYP. II II o _ z O z Iloll W/ LOCK WASHER �I�X NUT. TEST N <br /> l z � ( ) Iloll �- w °I <br /> I ! liry o O ° z N � U z w II II , i- N0. DATE REVISION DESCRIPTION <br /> 'll II EACH RISER FOR _LECTRICAL <br /> LLJ <br /> BRANCH CONNECTION FROM i ; �Iui C) w II II II II o o o o I� CONTINUITY TO i/EivI RACK (TYP.) o <br /> VENT RIDER MUST BE INSTALLED I LA o m ILA � � <br /> I _ „ „ I I 11 � �Q oQ I I I I z E <br /> LEVEL OR SLOPED BACK TO THE i I 1 0 cn 2 TEE WITH 1/4 TEST uj <br /> TANKS = v z o PORT FITTING AND 1/4" _ w I I I 1 2" TEE WITH 1/4" TEST s <br /> F <br /> I _ w PLUG (TYP.) I I I I PORT FITTING AND 1/4" 4 0 <br /> CD V) 0o I I I I �„ _ I I I PLUG (TYP.) 0 <br /> 2 SCH. 40 GALVANIZED STEEL 8 I I 71 E 0 2-IN-1 SENSOR 1 I j �- o I I s <br /> RISER. PAINT PER SPECS (TYP.) I I > w BOX I = X I I 3 <br /> I �_ I I I I c�,L I I I __0BOX <br /> SENSOR s <br /> 2" TEE WITH 1/4" TEST PORT <br /> I < EXPLOSION PROOF J-BOX 89 I I 1 I = I I 1 1 BOX <br /> FITTING AND 1/4 PLUG (TYP.) w MOUNTED TO POST <br /> I I I = 11 1 1 BOLTED GROUND CONNECTION TO I I 8 EXPLOSION PROOF J-BOX 8 0 <br /> I SEAL OFF 191 I I I VENT RACK I I I I MOUNTED TO POST 9 0 <br /> I I X I I I 2" OPENINGS WATERTIGHT I I 1 1 19 SEAL OFF D �j <br /> 1 1 COMPRESSION PASS THRU (TYP.) I I <br /> i EXPLOSION PROOF INSTALL (1) 1" CONDUIT <br /> 2-IN-1 SENSOR 1 I ! 189 J-BOX MOUNTED TO W/ PULL ROPE FOR 8 I MANOMETER HOUSING I I I INSTALL (1) 1" » <br /> POST FUTURE TANK DIAGNOSTIC I I 8 CONDUIT W/ PULL > <br /> BOX REQUIREMENTS ROUTE TO <br /> I MONITORING PANEL IN I I 1 HYDROSTATIC MONITOR SENSOR I I 1 ROPE FOR FUTURE z 41 <br /> - - - _ � j j TANK DIAGNOSTIC SEAL:- •� <br /> MANOMETER I i 191 SEAL OFF BUILDING I I I FOR DOUBLE WALL VENT 10l r - - - - - - _ _ - I°I REQUIREMENTS ROUTE <br /> HOUSING I o - - - - - - - - ° TRANSITION CONTAINMENT SUMP 101 _ <br /> - - - - - <br /> - - - <br /> HYDROSTATIC MONITOR SENSOR (- - - - - I I I TO MONITORING PANEL ,6 gP , E � o <br /> 1 j OPTIONAL 6" THICK OPTIONAL 6" THICK _ _ - - - TYPICAL SPILL _ - _ - - _ _ - IN BUILDING FOR DOUBLE WALL. VENT { I I CRETE SLAB - - - _ _ _ - 41 <br /> TRANSITION CONTAINMENT SUMP = _ _ CON CONCRETE SLAB = _ - - BUCKET AT GRADE C� Y �� o <br /> GRADE GRADE I 1 HIGHEST �\ I 11 I 1 I/ // // <br /> i o X I ELEVATION LEVEL / / j j 111 \/\/\/\/\/`\ X 3/31/11 <br /> 2" BELLxMALE ADAPTER 4 /\ I I I ��/////�// //�// j // // // // // I 1 Il I \ \ /\ II - - - - - \\ <br /> (TYP.) <br /> /\ I _ ►� _ \ \ \ \/\/ / / / / / / / II \ \ GRADE \/\ 1. — — �, <br /> DED FITTING �� 7-` — — — — i/,// // // / / / // // // // // 111 I 1 �I — \ \ /\/ ° I I III III I I \ \\ \` I\, ��\\ ®F c&L��o <br /> 3 FRP BON 138 `, , III \/ /\/\/\/\• , \\ \\ \\ \\ \\ \\ I �I III III I I \//\// / ,\\ \\ I I I I I I //\//i/ // // // °' <br /> W/ TEST PORT (TYP.) \� , it , I� I I Ia \/\\/\\/\\/\\/\\/ /\//\//\//\//\//\/ I .I I I II /\/\ \, / // 1 111 O�o \ <br /> 1 1 1 \ \ \ \ /\/\ . I I al . . \ TO INTRINSICALLY ws SLYSAFE <br /> 2 INSIDE 3 jl I ° I I / / /OPTIONAL 6 THICK Ij �o II j I WIREWAY IN BUILDING r�IFIDENTIp�rr STATEMENT: z <br /> DOUBLE WALL FRP °4 4 0 0 ' a III° RACK FOUNDATION TO TO INTRINSICALLY SAFE ° I° III III ° \ \/\/� \�' CONCRETE SLAB I I I II 4.' <br /> VENT LINE. SEE I Q III BE ENCASED IN 2,500 WIREWAY IN BUILDING~— Il III I I 1 III I I THE RECIPIENT RI THESE MATERIALS PRIVILEGED <br /> UNDERSTANDS THAT <br /> }— O 4 RECIPIENT AGREES TO' :'OPYRIGHT IN 1HE RETIAIN THESE MATERIALS IN STRICTALSO. I <br /> NOTE BELOW. I I Im 1 PSI CONCRETE I I I II I III I I THAT THE MATERIALS CONTAIN FACCORDI AND CONFIDENTIAL <br /> ' BUSINESS INFORMATION OF BP. ACCORDINGLY,THE N <br /> -_ I-- j — — <br /> ° III ° 74 2" FLEX CONNECTOR ° I a _ _ _ _ _ _ _ _ _ - - _ I ° I I ° 2" FLEX CONNECTOR(7�4�- l°I I - = = = = = = = _ _ - - J 1"1 CONFIDENCE AND AGREES NOT TO DISCLOSE THESE cD <br /> MATERIALS TO ANY OTHER PARTY AND FURTHER AGREES <br /> _ _ NOT TO MAKE COPIES OF THE MATERIALS. THE RECIPIENT o <br /> (TYP.) I I ° L_ - - - J a I I (TYP.) a, I a I " !NSIDE 3" DOUBLE WALL REPOSTO E FOR WIC MBP HAS MADELTHE MAT�EERIAULSI�D 1-11 <br /> _2 <br /> AVAILABLE. AND RECIPENT AGREES TO RE-URN ALL <br /> LIQUID SENSOR z 2" INSIDE 3'° DOUBLE WALL 14 14 42 <br /> BRINE FILLED DOUBLE 1 1 0 I o i 4 4^ �` rRT VES:T I�JE. SLO�'E 'TO INTENDED UR sP ETHER UPON COMPLETION OF THE <br /> 4"x3" CONCENTRIC / /'x� /\; \�j o NON-DISCRIMINAT{NG I - FRP VENT LINE. SLOPE TO o 4 ° � WALL VENT LINE 4 INTENDED PURPOSE OR UPON THE REQUEST OF BP. � <br /> 13'9 �/ / ,/��� � .� � � » ° I A. ° II 11 °. �4 BARE STRANDED CU TRANSITION SUMP E NOTE BELOW. <br /> .LOW. WtiocHE��ca��FIRST. U <br /> REDUCER (TYP.) 1 II °. TANK AT 1/8 PER FOOT II I TAN AT 1/8 PER :SOT <br /> I GROUND WIRE TO TANK L--„-”-�-- Mi�;;{�€�;;� ,E ` <br /> ILII . " ' II FIELD GROUNDING II LIP DOES NOT AND CANNOT WARRANT THAT THE PLANS FOR / <br /> O MINIMUM. SEE NOTE BELOW. 2 FLEX CONNECTOR I-� ' I PCTROIEUM STORAGE AND DISPENSING ARE COMPLIANT NTH rn <br /> 74 42" " ALL LEGAL REQUIREMENTS THAT EYJST OR AS THEY MAY BE a) <br /> BRINE FILLED DOUBLE 11 I I I I (TYP.) j l (TYP.) I al SYSTEM CONSTRUCTED <br /> 4 APPLIED IN TH£FUTURE. NOR DOES BP WARRANT THAT A c_ <br /> FUELING STORAGE AND <br /> WALL VENT LINE I I j\ //\� EAK& 'YOU AREWITITHESEDELIVERY SYSTEM N NS WILL BE�ORG T 3 <br /> LEAKS YOU ARE ACCORDINGLY STRONGLY ENCWRAGED TO LL O <br /> CONSULT NTH A FUELING STATION ENGINEER OF YOUR <br /> TRANSITION SUMP I I 4 1 1 1 BRINE FILLED DOUBLE I I 4 r 4 \ \ PLANS ARE TRULY SUFFICIENT FOR CONSTRUCTING THE <br /> I I . 4. WALL VENT LINE \/ a 4 / CHOOSING TO INDEPENDENTLY EVALUATE WHETHER THESE <br /> COMPACTED OR NATIVE SOIL I j I' I TRANSITION SUMP �/ // // /�\/ / / / STORAGE AND DELIVERY SYSTEM AT YOUR STATION. )(TYPICAL) I I : ' /\/\/\/\� SECTION B—B \\ \\ \\ DEVELOPMENT INFORMATION: E <br /> \ \ � / /\ UNDERGROUND STORAGE <br /> LOW- //\ L° /\\ a ° 4 \//� OPTIONAL 6" THICK C TANK STANDARDS <br /> 4 \ 4 \ CONCRETE SLAB <br /> SECTION A-A / // // // — — — — — — — ELEMENT TP01 <br /> � `�\ �\\�\ �� I VENT PIPING MOUNTING RACK FOU 2500 PSI CONCRETE V-9.0 2010 SERIES <br /> j - I FOUNDATION N <br /> IN ORDER TO PROVIDE MECHANICAL FLEXIBILITY WITHIN THE RIGID FRP PIPING SYSTEM, PROVIDE AT 1 I GENERAL SHEETS DESIGN INTENT <br /> LEAST 4 FEET OF STRAIGHT PIPE RUN BEFORE A CHANGE IN DIRECTION OF 30 DEGREES OR MORE. - - - - - - - - - - - - - - - - - - - o <br /> SECTION C-C <br /> SEE DETAIL 'A' �I (NFPA 30A (2000 & 2003) §5.3.3(2)), CFC (2007) §3403.6.9.1) I 0 r �1 (� �1 (/ ~1 (/ �} 11 II a I SITE ADDRESS. 10o <br /> THE VENT CONFIGURATION SHOWN IS IN ACCORDANCE WITH CP-201 THE NUMBER OF VENT CAPS AT EXPLOSION PROOF J-BOX II I 0/ O/ O/- - -0/ II I o <br /> ANY GDF SHALL NOT PERMIT AN ADDITIVE LEAK RATE OF MORE THAN .17 CHF AT 2 OF WATER MOUNTED TO POST 89 - <br /> VAPOR SENSOR COLUMN. MAX ALLOWED WITHOUT MANIFOLDING IS (3}. LIQUID SENSOR j I II I o <br /> OPERABILITY THE VENT DISCHARGE SHALL BE LOCATED SO THAT VAPORS ARE RELEASED AT A SAFE POINT OUTSIDE NON-DISCRIMINATING O II II I MINI HYDROSTATIC o <br /> TEST PORT F BUILDINGS AND NOT LESS THAN 3.6 M (12 FT) ABOVE THE ADJACENT GROUND LEVEL. VAPORS II 1I 'j <br /> MONITOR <br /> INTRINSICALLY SAFE <br /> 0 I II II I _0 <br /> HOUS NG SENSOR IN w <br /> VALVE ASSEMBLY - SHALL BE DISCHARGED UPWARD OR HORIZONTALLY AWAY FROM ADJACENT WALLS. VENT OUTLETS SHALL 2" BELLxMALE ADAPTER 4 � <br /> BE LOCATED SO THAT VAPORS WILL NST BE TRAPPED BY EAVES OR OTHER OBSTRUCTIONS AND SHALL I Q <br /> II \ II II BRINE FILLED DOUBLE <br /> GROUP I BE AT LEAST 1.5 M (5 FT ) FROM BUILDING OPENINGS. VENTS SHALL BE INSTALLED IN ACCORDANCE CNP.) I I 1 11 <br /> II I - I WALL VENT LINE DESIGNED BY: SH6(/0 �� aa�llt DB vw� <br /> TEST PORT ACTIVATED WITH (NFPA 30 (2003) §5.7.2), (UFC (2000) §7902.13). (IFC/CFC (2007) §3404.2.7.3.3). 3" FRP BONDED FITTING 3 1 II L - - - - _ - = II I TRANSITION SUMP cNEa®BY: SHK/0 �' ' DB o <br /> I VALVE CARBON BED VENT RISERS SHOULD STAND NO LESS THAN 3' FROM OUTSIDE EDGE OF CURB W/ TEST PORT {TYP.) I _ _ _ _ <br /> I I DRANM BY: O ALLIANCE PIA: ®B w <br /> SERVICEABLE THE ACTUAL NUMBER OF VENT RISERS IS DETERMINED BY THE NUMBER OF UNDERGROUND 4"x3" CONCENTRIC 39 0 0 0 0 0 0 0 VER": V_9.0 PRO,ECT ND: `00 <br /> n <br /> VAPOR SENSOR I STORAGE TANKS. THE DIESEL VENT RISER (IF INSTALLED) IS ALWAYS SEPARATE. REDUCER (NP.) j _- -- -- -- <br /> „ „ I o 0 0 0 0 0 0 0 1 01/04/2010 0 <br /> 2 INSIDE 3 DOUBLE 4 - - - - - _ _ - - - - - - jED DRAwINc TITLE: <br /> DESIGN CRITERIA - PER 2007 CBC WALL FRP VENT LINES 4 DESIGN INTENT: NEW VENT STACK <br /> SERVICEABLE (VACUUM MONITORED) INSTALLATION DETAILS WI VEEDER-ROOT 0 <br /> I <br /> FILTER ELEMENT SEISMIC LOADS o <br /> NOTE: 0 <br /> � I VEEDER ROOT CARBON CANISTER VAPOR CARSON CANISTER VAPOR POLISHER � <br /> I I SITE INFORMATION IMPORTANCE: 1 SITE CLASS = D POLISHER TO BE LOCATED IN (CALIFORNIA ONLY) <br /> NOTE: I- w �- w �- w F- w CONFORMANCE WITH MANUFACTURERS m <br /> BASIC RESISTING MAINTAIN A 5 FOOT CLEARANCE TO w I z w I z w I z_ w I z INSTALLATION MANUAL, CURB EXECUTIVE <br /> MEET NO: c <br /> SYSTEM: R-2 Q=2 GRADE AROUND CARBON CANISTER > -j > J > -1 > w ORDER VR-204--•D AND ALL APPLICABLE <br /> (REF: ASCE 7-05 Cd=2.5 SD1=1 .0 SDS=1 .83 VAPOR POLISHER FOOTPRINT STATE' AND LOCAL CODES. j <br /> CANISTER TABLE 15.4-2) I ---�--- 0 <br /> OPERABILITY BASE SHEAR EQ. (MAX. BASE SHEAR (MIN. BASE SHEAR C n R <br /> TEST PORT o <br /> DESIGN BASE ( 12.8-2) EQ. 12.8-2) EQ. 12.8-5&6 PLAN VIEW ° <br /> SHEAR: 0.92W V=CSW V=SDiW/TR/I V=.5SiW/R/I <br /> TAIL A SECTION D-D 2 5 <br /> V=0.92W V=1. 5W V=0.2 W <br /> iD <br /> SCALE: NONE SCALE: NONE `` <br />