Laserfiche WebLink
DISPENSER 28,7 le <br /> 26,9 cus=NT: <br /> 3'-77�6" SKIN 15.1 15.1 bp <br /> 31.8 23.8ol <br /> ------------ <br /> 3'-7 Y4" INSIDE „ N.P.T. VAPOR CABLE TO VAPOR PRESSURE <br /> 1 -1/2"N.P.T. INLET (3) » JUNCTION BOX <br /> RECOVERY OUTLET, 215 <br /> SENSOR <br /> 1 -5 1 <br /> v2-WAY ........................................................ ......:.:::.;..:.::;:; <br /> e I� <br /> (OPTIONAL) <br /> ) <br /> CALIBRATION 14 VAPOR FLOW I <br /> o® 0 c= VALVE SENSOR u3 Klf FUEL WHIP HOSE &1 SHORT 82 VAPOR SHEAR BREAK AWAYFORo �\ <br /> i cfl NIPPLE VALVE DISPENSER SIDE B T <br /> s -_ --- - 64 FUEL WHIP HOSE GLOBAL FUELS TECHNOLOGY <br /> � STABILIZER . . <br /> ASSEMBLY LIJ w I <br /> 150 dVARRENViLLE ROAD <br /> 1/4" OD REDUCE THREADS I z 65 FUEL HOSE BREAKAWAY NAPERVILLE, ILLINOIS 60563-8473 <br /> COPPER TUBING. FROM 1-1/2 TO �I I o NATIONAL SITE ADAPT CONSULTANT <br /> AVOID ANY 1/4" W/ DOUBLE NOTE: o <br /> TRAPS! (BY TAP BUSHINGS) CAT 5 CABLE SHALL BE INSTALLED o w <br /> CONTRACTOR) FOR BOTH ENHANCED OR STANDARD z ° <br /> PRODUCT #1 (REGULAR) °° ELECTRONICS <br /> V x 2 SLOTS FOR ANCHOR VAPOR RETURN o Ir <br /> BACK TO TANKS ui <br /> PRODUCT #2 (PREMIUM) -� L 102 ' 1'-1" BOLTS, 6 SPACES CONTAINMENT ( I z z I I <br /> " JUNCTION BOX SUMP 12" X 12" STEEL <br /> SIDE A VST PHASE II W/ VEEDER-ROOT ISD CANOPY COLUMN I <br /> i z <br /> i SCALE: NTS BALANCE PHASE II SYSTEM I I Iw <br /> 4 PVC CANOPY � I ° <br /> G®ttler -wy-&� t�,0, <br /> A-A DISPENSER MOUNTING DIAGRAM " <br /> DRAIN EACH COLUMN I'. I0511WAYN7 OVATION 3+0 6747 SIERRA CT. SUITE J <br /> 215 BLENDERSCALE: 1 =1 -0 HEALY PUMP 66 VAPOR PRESSURE I oDUBLIN, CA. 94568 <br /> SENSOR (1) 1" CONDUIT TO I ° I (925) 551-7555 <br /> DISPENSER EACH COLUMN <br /> SKIN ° ° ° <br /> 6" 6" CO MASTER DRAWING RELEASE HISTORY <br /> Mj <br /> D CABLE TO 5/8" COPPER TUBES & SAFETY NOTE: ol <br /> VERSION DATE <br /> JUNCTION BOX FITTINGS SUPPLIED WITH a' WHEN DISPENSERS ARE INSTALLED <br /> DISPENSER SUMP FRAME " 0 I 61 NOZZLE (TYP.) Coxx v-0 MAY 2000 <br /> (ADJUSTABLE HEIGHT) 2-WAY HEALY VP1000 KIT / \ AS SHOWN ON THIS DRAWING, THE <br /> CALIBRATION REQUIREMENTS OF NFPA 30A 6.3.9 Coxx V-1 FEB 2001 <br /> co p VALVE 14 VAPOR FLOW AND 6.3.9.1 REGARDING SHEAR FUEL HOSE Coxx V-2 JUNE 2001 c <br /> „ SENSOR / \ SECTIONS ARE FULLY MET. 19 <br /> 1 SHORTEj-- <br /> NIPPLE Coxx V-3 JAN 2002 <br /> :,I <br /> i : <br /> C C NIPPLE 82 VAPOR SHEAR , ! o " o o Coxx V-4 JUNE 2002 <br /> STABILIZER VALVE I z a <br /> ASSEMBLY <br /> I I � �' o COXX V-5 FEB 2003 <br /> COxX V-6 JULY 2004 <br /> 1/4" OD REDUCE THREADS - I I Coxx v-7 MARCH 2006 <br /> COPPER TUBING. FROM 1-1/2" TO CO ;, :' COXX v-8 JULY 2007 <br /> c <br /> AVOID ANY 1/4" W/ DOUBLE I �t o <br /> 010, <br /> SEE BOLLARD Coxx v-8.1 DEC 2008 <br /> TRAPS! (BY TAP BUSHING(S) ¢ DETAIL ON <br /> I D CONTRACTOR) I a I SHEET G.0.5 Coxx V-9.0 JAN 2010 i <br /> r VAPOR RETURN <br /> ! 6» BACK TO TANKS w 91 0 <br /> 6" CONT IN I N O I c <br /> A MENT <br /> 4 .5 I i� N0. DATE REVISION DESCRIPTION <br /> NOTE: CONDUITS SHALL SUMP 1 c <br /> RUN CONDUITS THROUGH c <br /> — HOLES IN DISPENSER SUMP PENETRATE SUMP FRAME AT HEALY PHASE II W f VEEDER-ROOT ISD EXPANSION JOINT 4,000 PSI 2 ° <br /> FRAME (TYP.) EITHER A OR B SIDE OF SCALE. NTS VAC. ASSIST PHASE II SYSTEM (TYP.) SEE <br /> THE DISPENSER. DO NOT FIBERMESH <br /> _........_............._ CONCRETE DETAILS 1l______._. ............... 3 � <br /> r, 1�,°, - CUT CUT SIDE PANELS OF NOTE: ; \ �_ a SHEET M.5.3.27 CONCRETE MIX <br /> B-B DISPENSER C"ONTAINMENT SUMP PLAN VIEW DISPENSER 1. ONLY (1) VAPOR PRESSURE CONCRETE SLAB - ( I - <br /> SCALE: 1" = 1'-0" SENSING DEVICE REQUIRED FOR DETAIL I as s f <br /> PER SITE. SENSOR SHALL BE a a a <br /> _ MOUNTED AT ONLY (1) a s <br /> DISPENSER LOCATED CLOSEST a `° a C° G. ` <br /> 2-IN-1 SENSOR 710 TO TANKS. ° a I c _........_._.._._.._..__._..__._........................................__._.._.......................................................... a .a G a 7 <br /> BOX <br /> SUMP SENSOR 189 2. CONTRACTOR SHALL PITCH ALL � ^ <br /> J-BOX 1 4" TUBING AS REQUIRED TO _I J I I I a s <br /> DISPENSER / w w <br /> DISPENSER SKIN J-BOX i PRODUCT SHEAR AVOID ANY LIQUID TRAPS ¢ o c <br /> 81 = EXPANSION I I c <br /> VALVE (TYP.) v OPTIONAL STORM DRAIN i <br /> I ELBY CAPPED ' <br /> JOINT (TYP.) �' <br /> ROUTING SEE CIVIL SITE I SEE CO! C` a TE - L <br /> (TYP.) BY PIPING WAYNEIONS I I— I �I <br /> ` ELBOW TYP. I � � PLAN ROUTING AND � DETAILS SHEET _ � � SEAL:- <br /> ELECTRICAL . <br /> r w CONTINUATION I M.5.3.427 FOR a <br /> SEAL OFF (TYP.) 191 w CONDUITS v I / i DETAIL c <br /> 82 VAPOR SHEAR VALVE v \\�\ \\�\\�\\�\\�\\�\\�\ \i o <br /> 1 CONDUITS 187 Z z o �p Arj <br /> ROUTED THROUGH <br /> HOLES IN SUMP ` <br /> FRAME TYP. A c- <br /> a•. `< � I Q � ��� �G <br /> x 1 11 <br /> 3 8 I E 03/3i/11 k <br /> i <br /> 1 <br /> Q' <br /> BRINE RESERVOIR & `9 <br /> HYDROSTATIC SENSOR n $ a', ' . . ° a . . �: a 85 DISPENSER CONTAINMENT p <br /> ` e d: FDIMEINSION. <br /> ©fi <br /> _........... a .I L. a . a . n n SUMP CAt`F <br /> " INSIDE 3" FRP ATTACHED TO SUMP a I I. a '.I I.' MUM RECOMMENDED <br /> 2 I. '� SEE NOTE BELO° ' A, a 1-1 2 x 18 FLEX ° a CONFIDENTIALITY STATEMENT ...._. <br /> 142 148 ° <br /> PRODUCT LINE » Q <br /> Q —a_ COMPACTED OR NATIVE SOIL THE RECIPIENT OF THESE MATERIALS UNDERSTANDS THAT <br /> THAT THETIN THE MATERIALSATERIALS CONi N'PRIMLEGED AND CONFIDENTID BY SP. AND AL r <br /> 3 B.W. FRP BONDED ENTRY 172 CONNECTOR H ° d a (TYPICAL) <br /> \ a d .. '°. ~ ° e a e da d :p I °' e I BUSINESS INFORMATION of BP. ACCORDINGLY, 1} ° <br /> T U e d a RECIPIENT AGREES TO RETAIN THESE MATERIALS IN STRICT <br /> FITTING W/ 4"0" CONCENTRIC > » ° a " COf�IDENCE AND AGREES NOT TO DISCLOSE THESE t <br /> REDUCER W/ TEST PORT & I ` 142 148 2' INSIDE 3 FRP ° <br /> NOTE• MATERIALS TO ANY OTHER PARTY AND FURTHER AGREES ° <br /> ��-" ����� � NOT TO MAKE COPIES OF THE MATERIALS. THE RECIPIENT <br /> VAPOR LINE to cn d ae ° d IF REQUIRED BY LOCAL AGREES TO USE THE MATERIALS ONLY FOR THE LIMITED <br /> 1/4" PLUG (TYP.) _ d— ^° a — <br /> PURPOSE FOR WHICH BP HAS MADE THE MATERIALS <br /> AVAILABLE, AND RECIPIENT AGREES TO RETURN ALL <br /> w W CODES, EXTEND CONCRETE MATERIALS TO BP EITHER UPON COMPLETION OF THE <br /> d . " ° d INTENDED PURPOSE OR UPON THE REQUEST OF BP, <br /> `i :a e ° d. d na e ° a a. a a .e .° ad ° d d .a ° <. ° °: ° a d. UNDER BOLLARD BELOW THE WF#ICHEVER COMES FIRST. <br /> • b 1 I a 4 a 1 1. .• o a° °e' d �. a. �E AND TANK DESIGN DISCLAIMER: <br /> . LLLJJJ LLLJJJ ° <br /> SUMP SENSOR IN DOUBLE WALL UNDER a <br /> 202 85 d ° a _ FROST LINE <br /> d � °a�. � 'a'' �� a�.� :a a 8P DOES NOT AND CANNOT WARRANT THAT THE PLANS FOR <br /> a ° ) (SEE STRUCTURAL PETROLEUM STORAGE AND DISPENSING ARE COMPLIANT WITH <br /> HOLDER DISPENSER SEE STRUCTURAL ) I PROJECTION OF ADA REQUIRED ALL LEGAL REQUIREMENTS THAT EXIST OR AS THEY MAY BE <br /> • • APPLIED IN THE FUTURE. NOR DOES BP WARRANT THAT A <br /> CONTAINMENT SUMP FUELING STORAGE AND DELIVERY SYSTEM CONSTRUCTED IN <br /> SIDE ELEVATION I NOTE: CANOPY FOOTINGS CAN BE VERY FRONT ELEVATION LEAKS. YOU WITH THESE PLANS WILL BE FREE OF ALL <br /> C-C: FRONT VIEW SECTION D ETA I L @ DISPENSER SUMP DISPENSER ON ISLAND I N STA L LAT I 0 N DETAILS LEAKS N ARE ACCORDINGLY STRONGLY ENCOURAGED TO <br /> CONSULT WITH A RIFLING STATION ENGINEER OF YOUR <br /> • LARGE AND CAN VARY IN SIZES. SEE CHOOSING TO INDEPENDENTLY EVALUATE WHETHER THESE <br /> SCALE: 1"=V-0" SCALE: 1" = 1'-0" STRUCTURAL DRAWINGS. STORAGE AND DELIVERY PLANS ARE TRULY C1SYSTEM ENT OATCYOUR STATION.ONSTRUCTING 1'E <br /> DEVELOPMENT INFORMATION: <br /> s77. — ADA PLATFORM (NTS SEE BELOW) <br /> ��, ° THE <br /> r <br /> I IF THERE IS 0 <br /> NOTE: N ROOM TO IN T <br /> S ALL T i E <br /> MINIMUM RECOMMENDED xIVDER R <br /> U GI OUIND T RA E <br /> FLOW MET <br /> S 0 G <br /> ER ABOVE THE SHEAR EAR VALVE <br /> DIMENSION. SEE NOTE BELO i' �-8- <br /> VAPOR <br /> IT IS ACCEPTABLE TO INSTALL FLOW ML-i ER "B'" SIDE OF DISPENSER / - TONIC STANDARDS <br /> " SHEAR EDITION'r : <br /> T <br /> BELOW Sh_AR VALVE PER LATEST �D,TI�aN C1=- I ' ;`` '"»',;':'':;',,: `,;'.::_'`; ',,'' ':'r `" •r„` ,:•” '. <br /> 2 —s ELEMENT TP®1 I <br /> E.O. VR-202 ON HEALY SOLUTION & E.O. ., V c <br /> 2-IN-1 SENSOR BOX 1 <br /> VR-204 ON VST SOLUTION. SEE MOST RECENT 15 VAPOR PRESSURE SENSOR V-9.0 2010 SERIES <br /> ( ) I I DISPENSER <br /> VEEDER ROOT INSTALLATION INSTRUCTIONS FOR �� ONLY 1 PER SITE LINE OF CANOPY 1'- " " CALIFORNIA MARKET <br /> ISD FLOW METERS SUMP SENSOR J—BOX 189 I SIDE B <br /> I 14 <br /> VAPOR FLOW SENSOR I I I -DISPENSER JUNCTION COLUMN <br /> BOX (TYP.) I ! SITE ADDRESS.• <br /> WAYNE OVATION DISPENSER FRAME I I BRINE RESERVOIR & <br /> ,,.< \\ _ 81 PRODUCT SHEAR VALVE HYDROSTATICa I - ` <br /> DISPENSER SUMP FRAME 1 SENSOR ° z , I <br /> I OCATION � <br /> .. � I � ��:AC I �. , <br /> ATTACHED TO SUMP , °i � ii ".,' CT AUTHORITY <br /> ', <br /> 82 VAPOR SHEAR VALVE I I I w z � N <br /> i 9 I BJE TO AU I HORITY i <br /> 1-1 2"x18" FLEX CONNECTOR 172 ELBY CAPPED ELBOW I OPTIONAL STORM DRAIN z w = 5 ° HAVING JURiSD!CTION. <br /> / I.... I I <br /> a SEAL-OFF (TYP.) J z :\ r Sl--'E BOLLARD DETAIL <br /> (TYP.) ROUTING, SEE CIVIL SITE SIJ _, 00 I 1 <br /> "1 w O OIw ON SHEET G.0.5 <br /> PLAN FOR ACTUAL ROUTING I I—0 w N -I � � r <br /> » DISPENSER z � z <br /> 3 D.W. FRP BONDED ENTRY 3 139 1. AND CONTINUATION w 0 I z w <br /> / c' ISLAND (TYP.) 1 �' w DESIGNED BY: ALLIANCE Z&DM: c <br /> FITTING W 4x3 CONCENTRIC 2" FRP TEE FITTING W/ / o SHK/0 DB c <br /> REDUCER W/ TEST PORT & REDUCER BUSHINGS AT 1 RUN CONDUITS THROUGH LINE OF FOUNDATION CHEM BY: SHK/0 BP RUM: DB i <br /> I <br /> 1/4" PLUG (TYP.) » HOLES IN DISPENSER SUMP BELOW. (SEE 91 DRAWN BY: GRS/O DANCE� DB <br /> DISPENSER ONLY, 2 FRP <br /> \\ FRAME "A" SIDE OR "B" STRUCTURAL <br /> s " ELBOW AT ALL OTHERS , . ) �q,I; PRO�CT�. L <br /> I 2 INSIDE 3 FRP 7 r e <br /> RECOVERY LINE 4� 148 SIDE O.K. (TYP.) m \ SIDE "A" / -9'Q c <br /> 1" DISPENSER m SENSOR MOUNTING / 01/04/2010 <br /> ° 187 <br /> MONITORING CONDUIT <br /> A <br /> DRAWING <br /> TITLE: <br /> HANGER KIT P <br /> rr <br /> TY <br /> 1 <br /> I — 187 1 CONDUITS 1, l i DISPENSER DETAILS: <br /> I - - ROUTED THROUGH / `3'-7�/2" � 1 <br /> HOLES IN SUMP 1 DISPENSER POWER 187 SUMP MONITOR I. WAYNE OVATION (3+0) BLEND <br /> • - 202 LIQUID SENSOR — , —� DISPENSER INSTALLATION DETAIL ` <br /> I r, <br /> 2 INSIDE 3 FRP 142 148 - FRAME (TYP.) & DATA CONDUIT DISPENSER ISLAND <br /> PR. DUCT LINE 90 5 -0 ON ISLANDS D.W.VAPOR <br /> Q ,�� SUMP SENSOR IN <br /> ( ) <br /> * (TYP.) �� T c <br /> 2 NOTE. THESE DIMENSIONS REPRESENT MINIMUM RECOMMENDED <br /> HOLDER <br /> OFFSET DIMENSIONS TO PROVIDE DESIRED CLEARANCE OF THE SHEET No: <br /> PEA GRAVEL-' FRP ELBOW WITH 164 144 -� �_ — COMPACTED OR NATIVE DISPENSER VALENCE FROM THE COLUMN AND ARE BASED ON A <br /> 2 FRP X 1-1/2 I I ' SOIL (TYPICAL) MAXIMUM 12"X12" NON-CLADDED COLUMN DESIGN. WHERE ADA REQUIRES 48"x30" MIN. AREA IN FRONT OF ° <br /> FNPT BUSHING 85 DOUBLE WALL UNDER DISPENSER ARCHITECTURAL COLUMN WRAPPING IS REQUIRED THE V-4 1/4" ..BOTH SIDES OF MPD, SLOPE NOT TO EXCEED 2 o. :``,� <br /> ! CONTAINMENT SUMP MINIMUM FACE TO FACE DIMENSION SHALL TAKE PRECEDENCE. THERE SHALL BE A 10" MIN DISTANCE FROM THE <br /> EDGE OF PLATFORM TO DISPENSER FACE FOR SIDE,: c <br /> D-D SIDE VIEW SECTION ® DISPENSER SUMP DISPENSER CONTAINMENT SUMP CONDUIT ROUTING DETAIL DISPENSER ON ISLAND PLAN VIEW REACHXX NOTE: INDICATES ITEMS FOUND ON <br /> I SCALE: 1"=V-0-0 SCALE: NONE SCALE: 1"=1'-0" 'L -- M ,5,3,23 <br /> - O MATERIALS LIST SHEET M.5.3.01 & M.5.3.02 <br /> i <br /> i <br />