CLIENT:
<br /> ' 7 DISPENSER 28.7 26.9
<br /> /6 SKIN °
<br /> 3 _7 15.1 15.1 31.8 23.8 Of
<br /> 3'-7 Y4" INSIDE CABLE TO 215 VAPOR PRESSURE
<br /> 1 1 /2"N.P.T. INLET 3
<br /> O PRODUCT #3 (DIESEL) JUNCTION BOX SENSOR DIESEL WHIP HOSE 73 \
<br /> v _�r
<br /> 2—WAY ..................... .......... \
<br /> --- CALIBRATION 14 VAPOR FLOW I \
<br /> \�
<br /> 1" N.P.T. VAPOR VALVE SENSOR k-oil i \�DIESEL BREAKAWAYRECOVERY OUTLET, 1 SHORT VAPOR SHEAR
<br /> (OPTIONAL) NIPPLE 82 VALVE - V 64FUEL WHIP HOSE
<br /> STABILIZER DIESEL HOSE 72 G 50 WARRENVILLE ROADY
<br /> ASSEMBLY1 4" OD REDUCE THREADSQ NAPERVILLE, IWNOIS 60563-8473
<br /> / — 65 FUEL HOSE BREAKAWAYCOPPER TUBING. FROM 1 1/2TO NATIONAL SITE ADAPT CONSULTANT:
<br /> AVOID ANY1/4" W/ DOUBLE NOTE: 0
<br /> TRAPS! (BY TAP BUSHING(S) CAT 5 CABLE SHALL BE INSTALLED v Z °
<br /> PRODUCT #1 (REGULAR) t „ ?/" x 2" SLOTS FOR ANCHOR CONTRACTOR) VAPOR RETURN FOR BOTH EELECTRONICS NHANCED OR STANDARD wo
<br /> 1 OY2 1 -i BOLTS, 6 SPACES BACK TO TANKS w
<br /> PRODUCT #2 (PREMIUM) - CONTAINMENT I z z
<br /> s SIDE "A" JUNCTION BOX SUMP 12" X 12" STEEL I I mI 0
<br /> Ld
<br /> VST PHASE II W VEEDER—ROOT ISD CANOPY COLUMN
<br /> 3;
<br /> SCALE: NTS BALANCE PHASE II SYSTEM I LZLJ WAYNE "OVATION" 3+1
<br /> 4" PVC CANOPY Io I 57 BLEtdDER ®gtf®� Ryan ®nP'®
<br /> A—A DI SPENSER MOUNTING DIAGRAM 47 SIERRA CT. SUITE J
<br /> DRAIN EACH COLUMN I 0 °°°° 67DU6 N, CA. 94568
<br /> SCALE: 1"=1'-O" HEALY PUMP 66 215 VAPOR PRESSURE I I (925) 551-7555
<br /> SENSOR CONDUIT TO °°°°
<br /> 3'-7"
<br /> DISPENSER ° ° ° EACH COLUMN I - - �I MASTER DRAWING RELEASE HISTORY
<br /> SKIN i
<br /> 91 — � M
<br /> 9 CABLE TO 5 8" COPPER TUBES & 44
<br /> SAFETY NOTE: °'i • VERSION DATE
<br /> JUNCTION BOX / O� WHEN DISPENSERS ARE INSTALLED X61 NOZZLE ITYP.) Coxx V—a MAY 2000
<br /> s
<br /> y= FITTINGS SUPPLIED WITH ,�,
<br /> 6 6 I
<br /> I
<br /> 00
<br /> AS SHOWN ON THIS DRAWING THE
<br /> F Y C
<br /> 2-WAY HEALY VP1000 KIT / I REQUIREMENTS OF NFPA 30A 6.3.9 ( Coxx V-� FLB 2001 c
<br /> D CALIBRATION I I:
<br /> STABILIZER I VALVE 14 VAPOR FLOW AND 6.3.9.1 REGARDING SHEAR I I, 63 FUEL HOSE coxa v-2 JUNE 2001 i
<br /> '! BARS (4) I SENSOR / \ SECTIONS ARE FULLY MET. I " Coxx V-3 JAN 2002
<br /> 1 SHORT
<br /> >; Qo 0 Q o w ' � El 0 COXX V-4 JUNE 2002
<br /> DISPENSERA NIPPLE 82 VAPOR SHEAR I , o
<br /> SUMP FRAME VALVE
<br /> STABILIZER z COXX V-5 FEB 2003
<br /> Ld COXX
<br /> JULY
<br /> c C ASSEMBLY I DIESEL NOZZLE (TYP.) 70 a COXX v-7 MARCH 00 06
<br /> 0
<br /> I I c
<br /> 1/4" OD REDUCE THREADS SEE BOLLARD Coxx v-8 JULY 2007
<br /> COPPER TUBING. FROM 1-1/2" TO I I o
<br /> 1 4" W DOUBLE DETAIL ON Coxx v-8.1 DEC 2008 i
<br /> Lj AVOID ANY / / SHEET G.O.S Coxx v-9.o JAN 2010
<br /> o TRAPS! (BY TAP BUSHINGS) DIESEL NOZZLE SWIVEL 71 o c
<br /> (TYP.) w I 91 o c
<br /> CONTRACTOR) VAPOR RETURN I Iuj
<br /> I No, DATE REVISION DESCRIPTION ;
<br /> BACK TO TANKS DISPENSER ISLAND (TYP.) gp I 4 5 I ,
<br /> D CONTAINMENT
<br /> L N\\
<br /> SUMP
<br /> 6" 6" NOTE: CONDUITS SHALL 2
<br /> PENETRATE SUMP FRAME AT HEALY PHASE II W f VEEDER—ROOT ISD EXPANSION JOINT 4,000 PSI c
<br /> 9 RUN CONDUITS THROUGH HOLES IN EITHER "A" OR "B" SIDE OF SCALE: NTS VAC. ASSIST PHASE II SYSTEM (TYP.) SEE FIBERMESH a
<br /> DISPENSER SUMP FRAME (TYP.) THE DISPENSER. DO NOT CONCRETE DETAILS CONCRETE MIX
<br /> CUT CUT SIDE PANELS OF NOTE: I............................ SHEET M.5.3.27 4 i
<br /> -B DISPENSER CONTAINMENT SUMP PLAN VIEW DISPENSER 1. ONLY (1) VAPOR PRESSURE CONCRETE SLAB - ° FOR DETAIL
<br /> SCALE: 1" = 1°-0" SENSING DEVICE REQUIRED CD a I °° s
<br /> PER SITE. SENSOR SHALL BE ° ° °
<br /> MOUNTED AT ONLY (1) ° 14 °
<br /> ° °
<br /> co °
<br /> DISPENSER LOCATED CLOSEST
<br /> 2-IN-1 SENSOR
<br /> BOX TO TANKS. e
<br /> SUMP SENSOR ter- _ 2. CONTRACTOR SHALL PITCH ALL I c° I I I I s I
<br /> J-BOX 189 ' 1/4" TUBING AS REQUIRED TO N I °
<br /> DISPENSER EXPANSION
<br /> DISPENSER SKIN J-BOX PRODUCT SHEAR AVOID ANY LIQUID TRAPS <J-BOX VALVE (TYP.) o OPTIONAL STORM DRAIN JOINT (TYP.) o
<br /> ROUTING, SEE CIVIL SITE SEE CONCRETE I s
<br /> LS SHEET
<br /> ELBY CAPPED I e PIPING UNIONS r I c~n I M 5 3DETA1 27 FOR ° ° SEAL
<br /> PLAN FOR ACTUAL � °a °�)
<br /> ELBOW (TYP.) -- BY WAYNE U) ELECTRICAL w ROUTING AND I DETAIL °
<br /> 191 I LLJ w CONDUITSLd CONTINUATION
<br /> \\ \\ \\ \\ \\\\\ \\ \\ \
<br /> SL OFF (TYP.) /
<br /> -
<br /> 1 82 VAPOR SHEAR VALVE v z
<br /> 1 CONDUITS 187 �
<br /> ROUTED THROUGH
<br /> HOLES IN SUMP ' 3/31/11 �r L
<br /> FRAME (TYP.) a
<br /> p
<br /> P e'
<br /> CA1-QFC
<br /> BRINE RESERVOIR & °. d '. DISPENSER CONTAINMEN
<br /> \-OHYDROSTATIC
<br /> ? . . b: 85 L
<br /> -..
<br /> HYDROSTATIC SENSOR • • ° e • 4 • I I ° ° e • . d:a *MINIMUM RECOMMENDED SUMP
<br /> ATTACHED TO SUMP ^ • DIMENSION. SEE NOTE BELOWCONFIDENTIALITY STATEMENT:
<br /> 2a' INSIDE 3" FRP I I ` J d •" " " •: ° —� a •. ° ' '°4 4 •' THE RECIPIENT OF THESE MATERIALS UNDERSTANDS THAT
<br /> PRODUCT LINE
<br /> 142 148 " _ D OR NATIVE SOIL
<br /> Q
<br /> 1-1/2%18" FLEX '�I [=A
<br /> p • - I� <�I — _a_ ( COMICAL) COPYRIGHT
<br /> THE TMATERIIALS CONTAIN NIPRIVILEGEDBAND CONFIDENTIAL
<br /> t
<br /> 172 T. d . —? + -a'. — d P►CA BUSINESS INFORMATION OF BP. ACCORDINGLY. THE L
<br /> �„ CONNECTOR I— ° a • ° °. . ° ° d TYPICAL)
<br /> ' I— a °• °� i I RECIPIENT AGREES TO RETAIN THESE MATERIALS IN STRICT
<br /> FRP BONDED ENTRY a, 1. c� c� I . CONFIDENCE AND AGREES NOT TO DISCLOSE THESE r
<br /> 3 39 \\ \
<br /> �:. FITTING W/ 4x3 CONCENTRIC ��\ ti • • °
<br /> MATERIALS TO ANY OTHER PARTY AND FURTHER AGREES
<br /> NOTE NOT TO MAKE COPIES A THE MATERIALS. THE RECIPIENT
<br /> � F. \^ 2 INSIDE 3 FRP
<br /> AGREES TO USE THE MATERIALS ONLY FOR THE LIMITED
<br /> \- ' \-�`' 142 148 ~ PURPOSE FOR WHICH BP HAS MADE THE MATERIALS
<br /> ( REDUCER W/ ,TEST 0 VAPOR LINE (1) d ' e • — _ • MATERIALS TO BP EITHER UPON COMPLETION OF THE
<br /> 1 4 PLUG • • cn ° a AVAILABLE. AND RECIPIENT AGREES TO RETURN ALL
<br /> IF REQUIRED BY LOCAL
<br /> (-TYP.) • �;° CODES, EXTEND CONCRETE INTENDED PURPOSE OR UPON THE REQUEST OF BP.
<br /> II w a ° LLJ a :• d UNDER BOLLARD BELOW THE WHICHEVER COMES FIRST.
<br /> a
<br /> `i • n • ° .< ° I a •° ° • ? ' ' °. ° PIPE AND TANK DESIGN DISCLAIMER:
<br /> d .e•. ,: FROST LINE.
<br /> } • < LJ. ° .•° '° ° d • a° j. a • • a�. .a ".' '.,° ° .ad. v u' .�,. BP DOES NOT AND CANNOT WARRANT THAT THE PLANS FOR
<br /> I' SUMP SENSOR IN 20 85 DOUBLE WALL UNDER • ° I APPLIED IN THE FUTURE NOR DOES BP WARRANT THAT A
<br /> PETROLEUM STORAGE AND DISPENSING ARE COMPLIANT WITH
<br /> HOLDER DISPENSER (SEE STRUCTURAL) (SEE STRUCTURAL) PROJECTION OF ADA REQUIRED ALL LEGAL THEREQFU UR THAT DOES
<br /> OR AS THEY MAY BE
<br /> FUELING STORAGE AND DELIVERY SYSTEM CONSTRUCTED IN
<br /> / • • CONFORMITY WITH THESE PLANS WILL BE FREE OF ALL
<br /> CONTAINMENT SUMP FRONT ELEVATION LEAKS. YOU ARE ACCORDINGLY STRONGLY ENCOURAGED TO
<br /> C—C: FRONT VIEW SECTION DETAIL @ DISPENSER SUMP DISPENSER ON ISLAND INSTALLATION DETAILS SIDE ELEVATION UR
<br /> NOTE: CANOPY FOOTINGS CAN BE VERY CONSULTETRULYSUFFI STATION ORCONSEUCTINGER OF H
<br /> CHOOSING TO INDEPENDENTLY EVALUATE WHETHER THESE
<br /> PLANS ARE TRULY SUFFICIENT FOR CONSTRUCTING THE
<br /> • LARGE AND CAN VARY IN SIZES. SEE STORAGE AND DELIVERY SYSTEM AT YOUR STATION.
<br /> SCALE: SCALE: 1 = 1 -0
<br /> " '➢ „ o
<br /> STRUCTURAL DRAWINGS. DEVELOPMENT INFORMATION:
<br /> _7 '7 '' '..^ `,:•`', ADA PLATFORM (NTS SEE BELOW)
<br /> NOTE; IF THERE IS NO ROOM TO INSTALL THE *MINIMUM RECOMMENDED UNDERGROUND STORAGE
<br /> VAPOR FLOW METER ABOVE THE SHEAR VAL'✓E, DIMENSION. SEE NOTE BELO / 3'-80' lie
<br /> 3'-8" \ TANK STANDARDS
<br /> IT IS ACCEPTABLE TO INSTALL FLOW METER B SIDE OF DISPENSER /
<br /> BELOW SHEAR VALVE PER LATEST EDITION OF 2 -6./ 2'-g" , ELEMENT TP01
<br /> SOLUTION-202 ON HEALY SOLUTION & E.O. - V-9.0 2010 SERIES
<br /> E.O. VR ,
<br /> - R BOX
<br /> r
<br /> 2 IN 1 SENSOR 1
<br /> L
<br /> E SENSOR
<br /> VAPOR PRESSOR S
<br /> I
<br /> A
<br /> SOLUTION. SEE MOST RECENT VR-204 ON VST 15
<br /> ���>�I � CALIFORNIA MARKET
<br /> LINE OF CANOPY C
<br /> ¢ VEEDER ROOT INSTALLATION INSTRUCTIONS FOR (ONLY 1 PER SITE) I I DISPENSER 1 /
<br /> COLUMN - 4 SIDE B
<br /> - 189
<br /> SUMP SENSOR
<br /> J BOX I
<br /> � ISL FLOW METERS � L
<br /> 14 VAPOR FLOW SENSOR I DISPENSER JUNCTION STE ADD�SS;
<br /> BOX (TYP.) / c
<br /> WAYNE OVATION DISPENSER FRAME--,,,,,, ,' ! I I I I c
<br /> I I BRINE RESERVOIR &
<br /> 81 PRODUCT SHEAR VALVE 12 / o_
<br /> k `.. .,, DISPENSER SUMP FRAME HYDROSTATIC SENSOR
<br /> I 0 I I ATTACHED TO SUMP wo V s
<br /> 82 VAPOR SHEAR VALVE I I I OPTIONAL STORM DRAIN z w � =� _ 91 SEE BOLLARD
<br /> ELBY CAPPED ELBOW L, _, I Z 0 � DETAIL ON
<br /> 1-1/2"x18" FLEX CONNECTOR 172 ;;;;;;;;; SEAL-OFF (TYP.) ROUTING, SEE CIVIL SITE w J � w oo I .. L
<br /> ° (TYP.) to Lotfu SHEET : .0.5
<br /> "J PLAN FOR ACTUAL ROUTING � 1—v w � _I 'sem -
<br /> �' ° I .t-----DISPENSER AND CONTINUATION w LL I w � -
<br /> 3" D.W. FRP BONDED ENTRY (, 39 \\ °.; ISLAND (TYP.) 1 c�o o I I I I DmGm BY. Si�iCJ® All1ANSE zit: D� t
<br /> FITTING W/ 4x3 CONCENTRIC, v „
<br /> REDUCER W TEST PORT & 2 FRP TEE FITTING W/ LINE OF FOUNDATION / I I
<br /> � REDUCER BUSHINGS AT 1 DasOEMe Y: Sw�® ,�PoLS'I :PIS D8 L
<br /> / „ RUN CONDUITS THROUGH � ' I E i GR5/0` D� L
<br /> 1/4" PLUG TYP. » HOLES IN DISPENSER SUMP BELOW. (SEE I ; I
<br /> I / (TYP.) DISPENSER ONLY, 2 FRP n " „ „ STRUCTURAL I I L
<br /> FRAME A SIDE OR B ) \
<br /> \� ELBOW AT ALL OTHERS o { : :3RoCT Na
<br /> 2 INSIDE 3 FRP 142 148 . SIDE O.K. (TYP.) SIDE "A" 01/04/2010
<br /> I RECOVERY LINE Li„
<br /> SENSOR MOUNTING
<br /> I -
<br /> 1 DISPENSER DRAWING TITLE:
<br /> r — — 187
<br /> MONITORING CONDUIT HANGER KIT (TYP.)
<br /> m DISPENSER ISLAND / DISPENSER DETAILS:
<br /> • 1” CONDUITS \ TYP. 90 �...' i
<br /> 187 ROUTED THROUGH (TYP.) / 3 -71/2 WAYNE OVATION (3+1) BLEND L
<br /> HOLES IN SUMP 1" DISPENSER POWER 202 SUMP MONITOR / I' \ DISPENSER INSTALLATION DETAIL `
<br /> I 187 LIQUID SENSOR
<br /> 2" INSIDE 3" FRP ti tJ - FRAME (TYP.) & DATA CONDUIT -
<br /> 142 148 ;,: .,. :- - * 5' �"
<br /> \ ..'�"
<br /> NOTE. THESE DIMENSIONS REPRESENT MINIMUM RECOMMENDED I ON ISLANDS(DW VAPOR)
<br /> PRODUCT LINE;: SUMP SENSOR IN
<br /> 02 OFFSET DIMENSIONS TO PROVIDE DESIRED CLEARANCE OF THE '� SHEET No
<br /> F C.
<br /> ,.. ... ..... L�° HOLDER
<br /> =""
<br /> DISPENSER VALENCE FROM THE COLUMN AND ARE BASED ON A� EE BOLLA A ON
<br /> COMPACTED OR NATIVE MAXIMUM 12"X12" NON-CLADDED COLUMN DESIGN. WHERE , S RDHEET IG.0.5
<br /> PEA GL 2" FRP ELBOW WITH 164 144 -1 1 �_ _ � "� :_
<br /> 2 FRP X 1-1/2 SOIL (TYPICAL) ARCHITECTURAL COLUMN WRAPPING IS REQUIRED THE V-4 1/4" � REQUIRES 48 x30 MIN. AREA IN FRONT OF
<br /> FNPT BUSHING DOUBLE WALL UNDER DISPENSER MINIMUM FACE TO FACE DIMENSION SHALL TAKE PRECEDENCE. ;��7.�BOTH SIDES OF MPD, SLOPE NOT TO EXCEED
<br /> 85 CONTAINMENT SUMP '':'..���",��IEDGEEOFSHALL
<br /> PLATFORM TO MIN DISPENSERDISTANCE
<br /> ACEFROM
<br /> OR TSIDE'....:I M ,5,3,23, 1
<br /> NOTE: INDICATES ITEMS FOUND ON
<br /> — DISPENSER CONTAINMENT SUMP CONDUIT ROUTING DETAIL DISPENSER ON ISLAND PLAN VIEW �:``�RE�cH XX MATERIALS LIST SHEET M.5.3.01 & M.5.3.02
<br /> D D SIDE VIEW SECTION @ DISPENSER SUMP �: ': :�' `` D
<br /> SCALE: 119=11-011 SCALE: NONE SCALE: 1"=V-0"-0
<br /> i
<br />
|