My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 4
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
3500 - Local Oversight Program
>
PR0545660
>
WORK PLANS_CASE 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 4:10:39 PM
Creation date
5/12/2020 3:21:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 4
RECORD_ID
PR0545660
PE
3528
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`i <br /> of firms subcontracted to MR, employees of contractors, employees of-the <br /> client, or employees of contractors retained by the client. <br /> 4. Notify the PM or PHSD of any medical conditions that may affect their ability <br /> to work. <br /> 6.4.1- Training Requirements for all Field Personnel <br /> { Project personnel must. be in compliance - -with- OSHA -regulations specified in <br /> 29 CFR 1910.120. These include: <br /> o n f a 40-hour health and safer training course. <br /> Completion o. y g <br /> o Completion of an.annual.8-hour health and safety update draining course. <br /> o Completion of an 8-hour. supervisor's training course for ,those employees <br /> working in a.supervising capacity. <br /> O Participation-in B&R's medical monitoring program. <br /> O Participation in B&R's health and.safety communication.program. <br /> rt <br /> F E 7.0 SITE CONTROL <br /> ;r <br /> f The purpose of site control is to minimize the potential exposure to site hazards and to prevent <br /> vandalism at the site. <br /> E E -8 DA981171H&SPLAN.WPN <br /> BOYAJIAN & ROSS, INC. <br /> Environmental Scientists & Engineers <br />
The URL can be used to link to this page
Your browser does not support the video tag.