Laserfiche WebLink
7.1 SITE SECURITY <br /> Site security will be the responsibility of the site owner. Contractors will be responsible for <br /> equipment stored at the sites. <br /> 7.2 COMMUNICATIONS <br /> A field representative associated with each ongoing task should contact the project manager or <br /> office at least once a day while in the field. <br /> Location of closest telephone: <br /> O On-site mobile phone in B&R pickup. <br /> O At property owner's residence located next to former market. <br /> 8.0 AIR MONITORING tt <br /> : E <br /> The following air monitoring equipment will be used when required by the activity being <br /> performed. <br /> X Photoionization Detector (PID) or Flame Ionization Detection - during activities where ' <br /> possibility of exposure to VOCs exist such as during drilling of soil borings, soil and <br /> groundwater sampling, or investigations where no information is available on an area. 1 <br /> Frequency of sampling: (Specify limits) <br /> Continuous <br /> X Intermittent monitoring of ambient air and the top of the boring during drilling. <br /> E - 9 D_19811 E&SPLAN.WPN <br />